News

Exclusive analysis articles with the latest market updates, and real-time news feeds.

[SMM News] Zimbabwe's Lithium Beneficiation Policy Set to Reshape Investment Flows, Move Country Up Value Chain
SMM, September 4: Zimbabwe's ability to attract and retain lithium mining investment depends on maintaining economic stability, infrastructure development and access to long-term capital, according to a Stanbic Bank Zimbabwe mining and metals executive. While the country's lithium endowment remains a major attraction for investors, unlocking further value from the sector requires increased investment in processing, infrastructure and power. Zimbabwe's lithium export restrictions, intended to encourage domestic processing, are already influencing investor capital allocation. The policy is expected to further shape investment decisions and could move the country up the lithium value chain. While domestic lithium beneficiation requires higher upfront capital investment for mining projects, the long-term benefits including increased export earnings, greater value addition, job creation and broader economic development are expected to outweigh initial costs. The export restrictions policy could also encourage industry consolidation, with smaller lithium mining companies pursuing strategic partnerships with larger operators through toll-processing arrangements, joint ventures or acquisitions. Financing requirements in the sector are shifting from being focused primarily on mining operations toward the wider lithium value chain. Stanbic Bank Zimbabwe provides funding for lithium mine development and processing plants, and can participate in syndicated financing for large projects, alongside trade finance, guarantees, letters of credit and working-capital facilities. Infrastructure, particularly security of power supply, remains a major investment requirement for the sector; the government is directing mining companies to develop their own power solutions, with the bank progressing renewable-energy transactions to support this. Rail and logistics infrastructure also require investment, with the bank facilitating funding for public–private partnership projects. Demand for longer-tenor structured project finance is increasing, with some lithium mining projects requiring financing terms of up to seven years, and requests for financing of lithium processing plants are rising. Regulatory certainty is described as a key consideration for lithium investors, weighed alongside resource quality and commodity prices; investors are less willing to commit capital where mining rights, taxation, foreign-currency regulations or export policies are unpredictable. Proposed reforms, including the Mines and Minerals Bill and a digital mining permit system, are cited as significant for providing this certainty. Environmental, social and governance (ESG) requirements are also increasingly factored into lithium mining finance decisions, with investors assessing green energy use, water and tailings management, emissions, community development, local economic participation and governance. Investment interest is broadening beyond lithium mining into processing and manufacturing as investors seek to secure critical mineral supply chains. Chinese investment is expected to remain significant in Zimbabwe's lithium sector, with interest from the Middle East, America and India also emerging. Zimbabwe's long-term positioning is linked to regulatory certainty, infrastructure, beneficiation, ESG performance and capital access, with potential to develop as a hub for battery material production rather than solely a supplier of raw lithium materials.
Sep 7, 2026 18:39
[SMM News] Zimbabwe's Lithium Beneficiation Policy Set to Reshape Investment Flows, Move Country Up Value Chain
South American Lithium Supply Disrupted: Sigma Suspension and Argentina Weather Impact Deliverability
South American Lithium Supply Disrupted: Sigma Suspension and Argentina Weather Impact Deliverability
South America’s lithium supply chain has recently faced a series of disruptions. In Brazil, Sigma Lithium’s Grota do Cirilo mine was ordered by a court to suspend its environmental licences and mining activities amid disputes related to environmental permitting and local communities. In Argentina, extreme winter weather has continued to affect high-altitude mining areas in the northwest, with road access to the Hombre Muerto salar temporarily disrupted and operations at some sites constrained. The immediate causes of these events are different. Sigma is facing risks associated with environmental permitting and community relations, while the disruptions in Argentina highlight the exposure of lithium brine operations to extreme weather, road logistics and infrastructure constraints at high altitude. From the perspective of the global lithium market, however, both developments point to a broader issue: As global lithium supply enters another period of concentrated capacity additions, the key variable is increasingly shifting from how much capacity has been announced to whether that capacity can actually be delivered according to expected timelines and ramp-up curves. Sigma Mining Suspension: Risks Extend from Current Supply to Future Expansion In September, a Brazilian court suspended the environmental licences and mining activities at Sigma Lithium’s Grota do Cirilo project. The dispute primarily concerns the project’s potential impact on the local Baú Quilombola community. The court determined that there was sufficient evidence to suggest that blasting and construction activities could affect the community and requested an independent assessment to further establish the actual distance between the mining operations and the protected community. Grota do Cirilo is currently Sigma’s only core producing asset, with existing annual lithium concentrate capacity of approximately 330,000 mt. Unlike delays at projects that remain under development, the immediate impact of this event is therefore on existing spodumene concentrate supply that has already entered the global trading system. In the short term, the actual supply impact will depend primarily on three variables: the duration of the mining suspension, existing ore and lithium concentrate inventories, and how long those inventories can sustain processing and exports. If the legal and permitting issues are resolved relatively quickly, Sigma may still be able to offset part of the short-term production loss through inventories and subsequent production recovery, limiting the impact on annual global lithium supply. However, if the suspension is prolonged and ore inventories gradually decline, the impact could extend downstream from mining to processing and exports, ultimately reducing the volume of Brazilian spodumene concentrate available to the international market. The medium-term implications deserve even greater attention. For lithium producers pursuing expansion, the stability of environmental permits, community relations and existing operations affects not only current production but potentially the approval, construction and capital deployment schedules of future expansions. The Sigma situation therefore needs to be assessed not only in terms of how many days production remains suspended, but also whether the legal dispute changes the market’s assessment of the deliverability of the company’s future expansion plans. In other words, if the issue is resolved quickly, it would remain primarily a temporary supply disruption. If permitting and community-related issues become prolonged, however, the situation could gradually evolve into a structural execution risk. Extreme Weather in Argentina: Limited Direct Production Losses, but Infrastructure and Project Delivery Risks Exposed Unlike Brazil, where lithium supply is primarily derived from hard-rock operations, Argentina’s incremental lithium supply is largely coming from brine projects. This winter, the Argentine Puna has experienced relatively severe weather conditions. Between July 19 and July 27, winter storms disrupted road access to the Hombre Muerto salar, with heavy snow accumulation on some routes and access temporarily restricted to four-wheel-drive vehicles. Employees and contractors at several mining operations were affected by the road disruptions, while Rio Tinto’s Fénix and Sal de Vida operations implemented precautionary operational suspensions. Significant snowfall returned in August. Some roads leading to the Hombre Muerto salar were again disrupted by snow and adverse weather, requiring continued road clearance and recovery work around the mining area. Based on currently available information, the direct loss of lithium production resulting from these weather events is expected to remain limited. The disruption therefore does not, at this stage, constitute a large-scale production loss capable of materially changing the global lithium balance. However, that does not make the events insignificant from a supply-analysis perspective. The more important issue is that extreme weather is exposing the infrastructure vulnerability behind Argentina’s rapidly growing lithium brine supply. Many Argentine lithium brine projects are located on the Puna plateau at elevations of approximately 3,500–4,500 metres. These operations are far from major cities, rail networks and ports, and both construction and production remain heavily dependent on road transportation. Under these conditions, extreme weather can affect not only the transportation of finished lithium products, but also the movement of equipment, reagents, construction materials and personnel into mining areas. For mature brine operations already operating at stable production levels, several days of road disruption can generally be partially absorbed through inventories and subsequent production recovery. For projects under construction, commissioning or ramp-up, however, the transmission mechanism is considerably longer: Extreme weather → road disruption → restricted movement of personnel and equipment → construction/commissioning delays → delayed ramp-up curve → annual incremental supply falling below the original plan. The key question surrounding Argentina’s weather disruptions is therefore not how many tonnes of lithium carbonate were lost on any particular day, but whether the disruptions alter the timing of incremental supply expected in H2 2026 and 2027. Argentina Enters a Concentrated Expansion Cycle: Ramp-Up Speed Matters More Than Nameplate Capacity The significance of this issue is closely related to the current stage of Argentina’s lithium supply cycle. Over the past several years, multiple Argentine brine projects have completed construction and progressively entered commercial production. The question facing the market is therefore no longer simply whether these projects can reach first production, but how quickly they can reach their design capacity. Cauchari-Olaroz provides a representative example of a project transitioning towards mature operations. The project produced 9,280 mt of lithium carbonate in the second quarter of 2026, with operations already approaching design capacity. At the same time, Stage 2 expansion is progressing, with plans to add 45,000 mtpa of LCE capacity, beginning with a 10,000 mtpa modular DLE facility. The principal risk at Cauchari-Olaroz has therefore gradually shifted away from the ramp-up of its initial capacity towards the execution and delivery of Stage 2. Centenario-Ratones remains at a more typical ramp-up stage. The project has design capacity of 24,000 mtpa LCE. It produced approximately 6,700 mt LCE in 2025, while capacity utilisation had reached approximately 90% by June 2026. Eramet is targeting production close to full capacity by the end of 2026. For projects at this stage, even if adverse weather does not result in a significant outright production stoppage, disruptions to operational stability can still create a gap between actual annual output and nameplate capacity. Meanwhile, Rio Tinto’s lithium portfolio in Argentina is rapidly entering a new phase of supply growth. Fénix 1B and Sal de Vida have both achieved first production, with Sal de Vida carrying design capacity of approximately 15,000 mtpa. The larger Rincon project is under construction, targeting approximately 60,000 mtpa of battery-grade lithium carbonate capacity. Production is planned to begin in 2028, followed by an expected ramp-up period of approximately three years to reach full capacity. For Argentina, therefore, the decisive factor determining incremental supply over the coming years is not simply the combined nameplate capacity of these projects, but their actual commissioning dates, the pace at which utilisation rates increase, and the time required to reach stable commercial production. The recent developments demonstrate that lithium supply risks in South America are becoming increasingly differentiated. Sigma represents the risk that existing supply may temporarily exit the market. Argentina’s large pipeline of new and expanding brine projects represents a different risk: future supply already incorporated into market expectations may arrive later than anticipated. Both ultimately affect the global lithium supply-demand balance, but through very different transmission mechanisms. The former directly affects near-term physical availability and could influence spodumene concentrate trade flows as well as the distribution of margins between miners and lithium converters. The latter primarily affects the incremental supply curve embedded in the medium-term global lithium balance. Global Lithium Supply Analysis Is Shifting from Nameplate Capacity to Risk-Adjusted Supply Over the past several years, global lithium supply analysis has largely focused on resource size, planned capacity, commissioning schedules and corporate expansion plans. However, as a growing number of projects move from planning into construction and production, simply adding together announced design capacities according to company commissioning schedules is becoming increasingly insufficient to accurately forecast actual supply growth. A project planning to add 50,000 mt LCE of capacity does not necessarily mean that the full 50,000 mt will enter the market in its first year of operation. A project must progress through a series of stages: Permitting → Financing/FID → Construction → Commissioning → Ramp-up → Stable operations → Logistics and sales. A disruption at any of these stages can result in actual supply falling below the amount implied by nameplate capacity. The nature of these constraints also varies significantly by region. Hard-rock operations in Brazil need to account for environmental permitting, community relations and operational stability. Argentine brine projects face high-altitude infrastructure constraints, weather exposure, brine-system performance, new processing technologies such as DLE and ramp-up execution. African projects additionally face road and port logistics, domestic processing requirements and changes in export policies. Some greenfield projects remain sensitive to lithium prices, financing availability and changes in capital expenditure. Future global lithium supply forecasting therefore needs to move beyond nameplate capacity towards risk-adjusted supply. At the project level, this can be expressed as: Risk-Adjusted Supply = Base-Case Production Forecast × Delivery Probability Delivery probability should not be treated as a static assumption. It should be dynamically adjusted according to permitting, financing, construction progress, technology and ramp-up performance, logistics and weather exposure, and operational stability. Following the Brazilian court’s suspension of Sigma’s mining activities, for example, the project’s nameplate capacity remains unchanged, but the probability of delivering the previously expected near-term supply should decline. If the suspension is quickly lifted, the corresponding risk weighting can subsequently be restored. Similarly, Argentine brine projects do not need to formally reduce their nameplate capacity for supply forecasts to change. If weather, road access or ramp-up issues persist, actual supply expectations for the following one or two quarters may need to be adjusted accordingly. For Lithium Prices, the Key Question Is Whether Supply Already Priced In by the Market Needs to Be Revised Down From the perspective of the global lithium balance, the suspension of a single Sigma operation and one period of severe winter weather in Argentina are not, by themselves, sufficient to change the broader direction of global lithium supply growth. This distinction is important when separating fundamental impact from short-term market sentiment. If Sigma resumes production relatively quickly and the impact of Argentine weather remains concentrated on short-term logistics, the effect of the two events on the annual global lithium balance should remain limited. Their price impact would be more likely to manifest as a temporary supply-risk premium. The implications would be considerably different, however, if these events prove symptomatic of broader project-execution challenges. The global lithium market has already incorporated substantial additional resource supply expected between 2026 and 2028. As a result, the marginal impact of another newly announced project is declining, while the marginal impact of a project already embedded in supply expectations being delayed, ramping up below expectations or suspending production may be increasing. In other words: The market increasingly needs to trade not only how much new capacity is being added, but how much of the incremental production already expected can actually be delivered. This is the broader significance of the recent Sigma disruption and extreme weather events in Argentina. Neither development currently represents a turning point for the global lithium supply outlook. However, both reinforce an important point: the global lithium industry does not lack announced resource capacity. What will ultimately determine the supply-demand balance in 2027 and beyond is the pace at which this capacity can be converted into stable, saleable production. As the market gradually shifts from trading “capacity additions” to trading “actual production additions,” supply deliverability may become an increasingly important variable in global lithium fundamentals and price formation. Lesley Yang SMM New Energy Analyst yangle@smm.cn
Sep 7, 2026 16:42
Goldman Sachs Sees Trend Reversal: $4,900 Gold Price in Sight!
September 3, 2026 Goldman Sachs is setting a new benchmark for the current year: With a price target of $4,900 per ounce, the U.S. investment bank forecasts that the record rally in the price of gold will continue. What at first glance appears to be an aggressive estimate is based on a fundamental paradigm shift. In addition to a historic buying spree by central banks and easing headwinds from interest rates, one often-underestimated catalyst is at work behind the scenes: a massive buildup of derivative positions that could drastically accelerate price swings. Central Banks as the Foundation—Fed Headwinds Are Ebbing The sustained demand from central banks forms the market’s bedrock. Central banks worldwide are consistently diversifying their foreign exchange reserves to reduce geopolitical and systemic risks—a structural trend that has been unfolding for several years. At an average of 50 metric tons per month, the official purchase volume this year is nearly three times higher than the historical average prior to 2022. Recent data even points to a further acceleration to a seasonally adjusted rate of around 100 metric tons per month, led by the People’s Bank of China. At the same time, interest rate pressure is noticeably easing. As markets price in speculation about further monetary tightening by the Federal Reserve and anticipate a cooling inflation trend, the interest-free precious metal is losing its biggest drag. The price target of $4,900 merely represents the base case scenario: Because gold remains historically underweight in institutional portfolios, growing doubts about the debt sustainability of Western nations, as well as ongoing geopolitical tensions, could unleash additional capital for portfolio reallocation. Derivatives as a Catalyst for the Rally The growing demand for gold call options to hedge portfolios holds particular upside potential. This leverage acts as a mechanical amplifier via the options market: As the spot price approaches the relevant strike prices, option writers are forced to purchase physical metal or futures contracts to hedge their short positions. This wave of hedging can transform an existing upward trend into a dynamic buying spiral. Since this derivative-driven acceleration effect is not included in the original base scenario, it significantly increases upside risk once again. At the same time, however, it also implies a market environment that will be characterized by sharper fluctuations in both directions should profit-taking set in. The combination of structural central bank purchases, waning interest rate headwinds, and the leverage effect of the options market means that the course is clearly set for gold to rise, according to analysts Source: https://goldinvest.de/en/goldman-sachs-sees-trend-reversal-usd4-900-gold-price-in-sight
Sep 7, 2026 13:49
August Copper Scrap Market Recap: Widening Price Spread, Muted Market Activity, and Invoice Constraints
In August 2026, the price difference between primary metal and scrap widened from 3,455 yuan/mt at the beginning of the month to above 5,000 yuan/mt by month-end, reaching a historical extreme range. On August 17, it shot up to 5,533 yuan/mt. The price difference between copper cathode rod and secondary copper rod also fluctuated at highs in the 1,150-2,260 yuan/mt range.
Sep 6, 2026 21:59

Latest News

[SMM Weekly Review] Hydrometallurgical Recycling Market This Week: Pure Cobalt and Ternary Black Mass Payables Fell Steadily, LFP Prices Mostly Fluctuated (Sep. 7, 2026 - Sep. 10, 2026)
Raw material side, lithium carbonate prices consolidated at lows this week, with lows repeatedly finding support near 140,000 yuan/mt and highs moving lower day by day from 155,000 yuan/mt at the start of the week. Nickel sulphate prices consolidated in a narrow range, while cobalt sulphate prices broke their stabilisation from last week and resumed declines with widening losses.
1 hour ago
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
The Democratic Republic of Congo is accelerating geological mapping, airborne surveys and digitisation of historical records to build a national geological databank covering its critical minerals, including lithium, according to Raoul Wazenga Vitima, director general of the National Geological Survey of Congo (SGNC). A $180 million contract with geodata firm Xcalibur began in January and is surveying more than 700,000 sq km using airborne geophysics and data analytics to identify exploration targets across the country's largely unexplored territory. The programme is one of several ongoing mapping initiatives funded by the government, mining revenues and international partners, with results feeding into the national databank, which is expected to be fully operational by the end of 2026. SGNC estimates systematic exploration currently covers barely 20% of the country, meaning large areas holding potential lithium deposits remain unmapped. Congo hosts lithium deposits alongside other critical minerals, though exploration activity to date has been concentrated mainly in the country's copper-cobalt belt, leaving lithium-prospective ground comparatively underexplored. Unlike jurisdictions such as Australia, Congo plans to retain state control over access to the databank. Vitima said the system will operate on a tiered basis, with basic geological information available free of charge and access to more sensitive datasets fee-based, with revenues intended to fund continued exploration and mapping. He did not specify the fee structure or which data categories would be charged. Vitima said the database is not intended to favour any single trading partner and that access rules would apply equally to all companies regardless of origin. He said Congo also has geological survey partnerships with France's BRGM, South Africa's Council for Geoscience, KoBold Metals, Atlas Park, Japan's Solafune and Belgium's AfricaMuseum, and that Saudi Arabia is separately using Xcalibur for its own national geological mapping, with Congo sharing exploration experience with the kingdom.
1 hour ago
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
On september 9th, Sigma Lithium has stated it has not received any legal communication regarding a preliminary judicial ruling that reportedly suspended environmental licences at its Grota do Cirilo mine in Brazil. The company said mining and industrial activities continue uninterrupted, with production targets unchanged at 240,000 mt of lithium oxide concentrate over the next 12 months, rising to 330,000 mt in the 2027 financial year. Sigma said the ruling was issued without due process and that it will begin its legal defence when courts resume normal operations on September 8, following a three-day national holiday recess. The company said it has consistently provided technical, environmental and quantitative data to authorities. The ruling stems from a civil suit brought by a Quilombola community federation, which argued the Grota do Cirilo project falls within the direct area of influence of the Bau Quilombola territory, a designation that would trigger a requirement for free, prior and informed consultation. The presiding judge cited studies placing the territory 2.7 km from the project's directly affected area, within an 8 km threshold that activates the more extensive licensing process, and pointed to blasting and earthmoving activity near the community as grounds for risk of harm. Sigma has argued the project lies outside the impact zone. The court has ordered an independent georeferencing review to determine the exact distance between the project and the Quilombola territory. Beyond the alleged suspension of environmental licences, the ruling bars Minas Gerais state from issuing new licences to the project and sets a fine for continued operations.
1 hour ago
[SMM News] Albemarle Averts Chile Lithium Strike as Union Reaches Preliminary Wage Deal
On September 9th, Albemarle Corporation has reached a preliminary wage agreement with union leaders at its Chilean lithium operations, averting a strike that had been due to begin at the close of mediated talks, according to the union. Voting on the accord by union members is set to begin at 9:30 a.m. local time Wednesday, with the two sides agreeing to extend mediation by two days to allow the vote to take place. Union leader Elias Torres said in an audio message that the company's new offer meets the union's demands. Albemarle had not immediately responded to a request for comment made after business hours. Albemarle's Chilean operations extract lithium from brines at the Atacama salt flat, one of the world's major lithium resources, and process the material at the company's La Negra plant in the Antofagasta region. Averting a strike removes the risk of a prolonged stoppage that could have tightened supply from a major source of the battery metal, The last strike at the operations, in 2021, lasted 35 days.
1 hour ago
Morocco's Phosphate Chemical Industry: Resource Endowment, Export Landscape, and Capacity Expansion
Morocco's Phosphate Chemical Industry: Resource Endowment, Export Landscape, and Capacity Expansion
Morocco accounts for approximately 68% of global phosphate rock reserves, with grades as high as 33% (P₂O₅), and is predominantly surface-mined, giving it significant cost advantages. Exports are carried out through four major ports: Casablanca, Safi, Jorf Lasfar, and Laayoune, with Safi Port emerging as a strategic hub.
1 hour ago
Elevra Lithium's NAL Expansion to Double Spodumene Output, Cut Costs by 2029
ASX and Nasdaq-listed Elevra Lithium has confirmed in a prefeasibility study (PFS) that an expansion project at its North American Lithium NAL mine in Québec can significantly increase yearly spodumene concentrate production and reduce unit operating costs. The three-stage brownfield expansion will raise plant throughput to the permitted 4,500 t/d from mid-2027 Stage 1, lift milling capacity to 6,500 t/d from mid-2028 (Stage 2), and add a permanent crushing solution by mid-2029 Stage 3. Post-expansion, average yearly spodumene concentrate production is expected to reach 373,000 t, nearly double the no-expansion scenario. Elevra CEO and MD Lucas Dow said the staged approach allows additional production from mid-2027 by progressively increasing throughput while managing capital deployment. NAL's life-of-mine C1 cost of $649/t C$876/t is expected to fall to $630/t C$851/t post-expansion, with all-in sustaining costs of $680/t (C$918/t). Initial capital expenditure is C$366 million $271 million, fully funded through Elevra's May financing package. Existing ore reserves of 47.2 million tonnes grading 1.12% lithium oxide underpin the production profile over 20 years.
1 hour ago
Second-life application market remained stable this week, with category divergence and dismantled products under pressure [SMM weekly review]
This week, the second-life battery market operated steadily overall, with limited fluctuations in quotations across categories and a generally subdued trading atmosphere. Cost side, raw materials weakened overall, with divergent trends across categories. This week, lithium carbonate prices saw a notable decline, cobalt sulphate broke its previous stable trend and began to pull back, while nickel sulphate prices remained basically stable, edging down only slightly. Cost support from raw materials continued to weaken, but due to the lag in industry chain transmission, this week's raw material fluctuations have not yet been significantly passed through to second-life finished products. Supply side, the pace of shipments continued to recover, with circulation order gradually returning to normal. Market shipments extended the previous recovery trend, and as industry compliance gradually improved, the circulation pace of second-life supply steadily returned to normal. Battery cell supply across categories recovered to normal levels, with no extreme situations such as concentrated releases or supply tightening. Demand side, category divergence persisted. LFP battery cell demand remained stable and continued to serve as the core support of the market; ternary battery cell demand remained mediocre, with weak downstream purchase willingness and lacklustre follow-through in transactions. Meanwhile, the trend of dismantled supply flowing to the recycling segment continued, exerting some pressure on second-life market prices. Prices of dismantled products still have downside room, but supported by rigid demand, the overall stable pattern of the short-term market has not yet been broken. Overall, the current market faces both supporting and pressuring factors. Weakening costs and demand divergence are creating price pressure, while rigid demand is underpinning the market bottom. The second-life battery market is expected to maintain a stable operating trend in the short term.
2 hours ago
Lithium Carbonate Market Weekly Summary: Spot lithium carbonate prices drifted lower during Sep 7-10 [SMM Weekly Review]
3 hours ago
Electrolyte prices remained stable this week (2026.9.7-9.10) [SMM lithium battery electrolyte market weekly review]
[SMM Lithium Battery Electrolyte Market Weekly Review: Electrolyte Prices Remain Stable This Week (2026.9.7-9.10)] From September 7 to September 10, 2026, electrolyte prices remained stable. The future market trend of electrolyte prices still requires continued monitoring of raw material price fluctuations and their transmission.
3 hours ago
SMM Daily Review: Spot Lithium Carbonate Prices Drifted Lower on September 10
Today, SMM battery-grade lithium carbonate spot prices drifted lower compared with the previous trading day. The lithium carbonate 2701 contract opened higher at 142,300 yuan/mt today. After the open, bulls pushed prices up quickly to around 143,800 yuan/mt, but the level did not hold, and the contract then consolidated lower under selling pressure from bears. Near midday, prices accelerated downward, hitting a low of 139,500 yuan/mt. In the afternoon, bulls organized a rebound from low levels, and prices recovered to near the average price line. In late trading, prices weakened again, closing near 141,300 yuan/mt, down 0.52% at 141,300 yuan/mt. Open interest increased by 3,280 lots. This week, China's lithium carbonate production gradually climbed as lithium chemical plants using spodumene resumed production after maintenance and raw materials arrived at ports, while production from other raw material sources remained relatively stable. From the perspective of actual market transactions and inventory, upstream lithium chemical plants showed increasingly strong sentiment to hold prices firm and hold back from selling spot orders as spot prices drifted lower. Long-term contracts and additional volumes under long-term contracts were shipped gradually, and inventory destocked slightly. Downstream cathode material plants, battery cell manufacturers, and other downstream players are in the period of pre-stocking for September and October, adopting a dip-buying strategy. They showed strong willingness to purchase and stockpile near 140,000 yuan/mt, with relatively active buying, so inventory accumulated slightly. Traders saw a significant inventory drawdown as upstream spot order selling slowed and downstream players bought the dip to stockpile.
3 hours ago
[SMM Analysis] Some downstream cargo pick-up willingness weakened, and precursor prices fell under pressure
This week, ternary cathode precursor prices weakened, with cobalt sulphate and nickel sulphate prices declining during the week, while manganese sulphate prices remained stable.
3 hours ago
[SMM Analysis] Spot Trading Sentiment for Ternary Cathode Improved Slightly This Week
6 hours ago
[Solid-state: Beijing 15th Five-Year plan pushes solid-state battery industrialization]
The Beijing municipal government issued its 15th Five-Year plan for high-tech industries on Sept 9, proposing to advance technical verification, demonstration and industrialization of multiple new energy storage routes including solid-state batteries, and to accelerate breakthroughs in all-solid-state and high-performance hydrogen fuel cells for vehicles. The plan targets lifting the NEV share to 70 percent, cultivating core projects in power batteries, drive motors and smart chassis, and building supporting capabilities in automotive chips and smart cockpits. It also promotes recycling of used power batteries in the Beijing-Tianjin-Hebei region, and aims for national-level green factories to account for 50 percent of manufacturing output by 2030.
6 hours ago
Nord Precious Metals Reports New Castle East Drill Results, Confirming Multiple Silver-Cobalt Mineralized Intervals
According to Nord Precious Metals on September 9, the company announced new drilling results from its high-grade Castle East silver project in Ontario, Canada. Wedge hole CS-26-140W1 intersected three silver-cobalt mineralized zones between depths of 404.20 metres and 463.60 metres. The upper 2-metre interval graded 4,683 g/t silver and 0.53% cobalt, including a 0.3-metre section grading 20,676 g/t silver and 1.16% cobalt. Another 0.3-metre interval returned 2.32% cobalt. A lower 0.9-metre interval graded 4,540 g/t silver and 0.24% cobalt, including 0.3 metres at 0.72% cobalt. The company said the results provide additional high-grade silver-cobalt mineralization data for the Castle East geological model and will support further evaluation of mineralized continuity and structural relationships. The reported intervals represent core lengths, while true widths have not yet been determined. The project remains at the exploration stage and has not yet established any quantifiable additional cobalt supply.
7 hours ago
[SMM News] Zimbabwe's Lithium Beneficiation Policy Set to Reshape Investment Flows, Move Country Up Value Chain
[SMM News] Zimbabwe's Lithium Beneficiation Policy Set to Reshape Investment Flows, Move Country Up Value Chain
SMM, September 4: Zimbabwe's ability to attract and retain lithium mining investment depends on maintaining economic stability, infrastructure development and access to long-term capital, according to a Stanbic Bank Zimbabwe mining and metals executive. While the country's lithium endowment remains a major attraction for investors, unlocking further value from the sector requires increased investment in processing, infrastructure and power. Zimbabwe's lithium export restrictions, intended to encourage domestic processing, are already influencing investor capital allocation. The policy is expected to further shape investment decisions and could move the country up the lithium value chain. While domestic lithium beneficiation requires higher upfront capital investment for mining projects, the long-term benefits including increased export earnings, greater value addition, job creation and broader economic development are expected to outweigh initial costs. The export restrictions policy could also encourage industry consolidation, with smaller lithium mining companies pursuing strategic partnerships with larger operators through toll-processing arrangements, joint ventures or acquisitions. Financing requirements in the sector are shifting from being focused primarily on mining operations toward the wider lithium value chain. Stanbic Bank Zimbabwe provides funding for lithium mine development and processing plants, and can participate in syndicated financing for large projects, alongside trade finance, guarantees, letters of credit and working-capital facilities. Infrastructure, particularly security of power supply, remains a major investment requirement for the sector; the government is directing mining companies to develop their own power solutions, with the bank progressing renewable-energy transactions to support this. Rail and logistics infrastructure also require investment, with the bank facilitating funding for public–private partnership projects. Demand for longer-tenor structured project finance is increasing, with some lithium mining projects requiring financing terms of up to seven years, and requests for financing of lithium processing plants are rising. Regulatory certainty is described as a key consideration for lithium investors, weighed alongside resource quality and commodity prices; investors are less willing to commit capital where mining rights, taxation, foreign-currency regulations or export policies are unpredictable. Proposed reforms, including the Mines and Minerals Bill and a digital mining permit system, are cited as significant for providing this certainty. Environmental, social and governance (ESG) requirements are also increasingly factored into lithium mining finance decisions, with investors assessing green energy use, water and tailings management, emissions, community development, local economic participation and governance. Investment interest is broadening beyond lithium mining into processing and manufacturing as investors seek to secure critical mineral supply chains. Chinese investment is expected to remain significant in Zimbabwe's lithium sector, with interest from the Middle East, America and India also emerging. Zimbabwe's long-term positioning is linked to regulatory certainty, infrastructure, beneficiation, ESG performance and capital access, with potential to develop as a hub for battery material production rather than solely a supplier of raw lithium materials.
Sep 7, 2026 18:39
[SMM Tungsten Analysis] Global Tungsten Market's Quintuple Dilemma: Smelting Capacity Bottleneck at the Core
[SMM Tungsten Analysis] Global Tungsten Market's Quintuple Dilemma: Smelting Capacity Bottleneck at the Core
Sep 4, 2026 16:21
[SMM Analysis]  LME Stocks Climb While Backwardation Widens — What's Behind Zinc's Apparent Paradox?
[SMM Analysis] LME Stocks Climb While Backwardation Widens — What's Behind Zinc's Apparent Paradox?
Sep 8, 2026 17:27
[SMM Analysis] Indonesia's Sulphur and Sulphuric Acid Import and Export Data for July
[SMM Analysis] Indonesia's Sulphur and Sulphuric Acid Import and Export Data for July
Sep 7, 2026 15:07
South American Lithium Supply Disrupted: Sigma Suspension and Argentina Weather Impact Deliverability
South American Lithium Supply Disrupted: Sigma Suspension and Argentina Weather Impact Deliverability
Sep 7, 2026 16:42
Goldman Sachs Sees Trend Reversal: $4,900 Gold Price in Sight!
Goldman Sachs Sees Trend Reversal: $4,900 Gold Price in Sight!
Sep 7, 2026 13:49
August Copper Scrap Market Recap: Widening Price Spread, Muted Market Activity, and Invoice Constraints
August Copper Scrap Market Recap: Widening Price Spread, Muted Market Activity, and Invoice Constraints
Sep 6, 2026 21:59
Latest News
[SMM Separator Weekly Review] Supply-demand balance remains tight, coated products poised for price hikes
20 mins ago
Cost Support Weakens as Cobalt Prices Fall Across the Board
50 mins ago
Core Lithium Resumes Spodumene Production at Finniss, Boosting Capacity by 20% After Two-Year Break
1 hour ago
[SMM Weekly Review] Hydrometallurgical Recycling Market This Week: Pure Cobalt and Ternary Black Mass Payables Fell Steadily, LFP Prices Mostly Fluctuated (Sep. 7, 2026 - Sep. 10, 2026)
1 hour ago
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
1 hour ago
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
1 hour ago
[SMM News] Albemarle Averts Chile Lithium Strike as Union Reaches Preliminary Wage Deal
1 hour ago
Morocco's Phosphate Chemical Industry: Resource Endowment, Export Landscape, and Capacity Expansion
Morocco's Phosphate Chemical Industry: Resource Endowment, Export Landscape, and Capacity Expansion
1 hour ago
Elevra Lithium's NAL Expansion to Double Spodumene Output, Cut Costs by 2029
1 hour ago
Second-life application market remained stable this week, with category divergence and dismantled products under pressure [SMM weekly review]
2 hours ago
This week, artificial graphite remained stable awaiting price increases, while natural graphite continued its weak trend [SMM Lithium Battery Anode Raw Material Market Weekly Review]
2 hours ago
Graphitisation tolling service prices hold steady; supply-demand tight balance to keep market consolidating on a strong note [SMM Lithium Battery Anode Raw Material Market Weekly Review]
2 hours ago
This week, low-sulphur petroleum coke continued its upward trend, while needle coke remained in a stalemate [SMM Lithium Battery Anode Raw Material Market Weekly Review]
3 hours ago
Lithium Carbonate Market Weekly Summary: Spot lithium carbonate prices drifted lower during Sep 7-10 [SMM Weekly Review]
3 hours ago
Electrolyte prices remained stable this week (2026.9.7-9.10) [SMM lithium battery electrolyte market weekly review]
3 hours ago
SMM Daily Review: Spot Lithium Carbonate Prices Drifted Lower on September 10
3 hours ago
[SMM Analysis] Some downstream cargo pick-up willingness weakened, and precursor prices fell under pressure
3 hours ago
[SMM Analysis] Spot Trading Sentiment for Ternary Cathode Improved Slightly This Week
6 hours ago
[Solid-state: Beijing 15th Five-Year plan pushes solid-state battery industrialization]
6 hours ago
Nord Precious Metals Reports New Castle East Drill Results, Confirming Multiple Silver-Cobalt Mineralized Intervals
7 hours ago