iconJun 21, 2024 17:49
Source:SMM
【BMW cancels overseas battery order worth billions due to delayed delivery】According to a report by the German magazine "Manager Magazin" on June 20, BMW has withdrawn a battery order worth 2 billion euros (about 15.57 billion yuan). This order was originally signed in 2020 as a "long-term" battery supply contract between BMW and Swedish battery manufacturer Northvolt. At that time, BMW ordered the fifth-generation batteries planned by Northvolt, which would be produced "100% using wind and hydroelectric power" and delivered to BMW in 2024. There are two reported reasons for BMW to cancel the order: first, the quality of the batteries provided by Northvolt "has not yet met expectations"; the second and more important factor is that Northvolt failed to deliver the batteries on time.

For queries, please contact William Gu at williamgu@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news