Power Battery Output is Expected to Exceed 20 GWh in December

Published: Jan 12, 2022 17:17
The domestic power battery output totalled 28.2 GWh in November, up 122% on the year and 12% on the month.

SHANGHAI, Jan 12 (SMM) - The domestic power battery output totalled 28.2 GWh in November, up 122% on the year and 12% on the month. The year-end rush to produce boosted the demand for power batteries. The domestic battery output increased faster and hit a record high of 28.2 GWh in November. The current output of NMC and lithium iron phosphate battery is growing rapidly. The output of NMC batteries output stood at 10.4 GWh in November, a month-on-month increase of 13% and an increase of 43% on the year, while the monthly output of lithium iron phosphate batteries stood at 17.8 GWh, a month-on-month increase of 12%, and a surge of 230% year on year. The overall market shares have not changed significantly as there was no significant difference between their growth rates.

The total installed capacity in November was 20.8 GWh, up 35% on the month and 121% on the year. The installed capacity rebounded due to the busy production at end-users at the end of the year after a poor performance in October. The installed capacity of NMC battery stood at 9.2 GWh in November, an increase of 33% month on month and an increase of 64% on the year. And that of lithium iron phosphate battery surged 37% on the month and 209% on the year to 11.6 GWh.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Landslide Occurred in the Safi Copper-Cobalt Mine Area in the DRC
1 hour ago
Landslide Occurred in the Safi Copper-Cobalt Mine Area in the DRC
Read More
Landslide Occurred in the Safi Copper-Cobalt Mine Area in the DRC
Landslide Occurred in the Safi Copper-Cobalt Mine Area in the DRC
A landslide occurred in the Saffi copper-cobalt mining area in the DRC, and at least 12 artisanal miners were tragically killed. According to the Artisanal and Small-Scale Mining Assistance and Supervision Service, heavy rainfall destabilized the ground, triggering the landslide that buried workers at the mining site. As of press time, 9 bodies had been recovered, and rescue teams were still searching for other victims who might have been trapped beneath the debris.
1 hour ago
Glencore taps Wuxi exchange to meet cobalt demand
1 hour ago
Glencore taps Wuxi exchange to meet cobalt demand
Read More
Glencore taps Wuxi exchange to meet cobalt demand
Glencore taps Wuxi exchange to meet cobalt demand
LONDON, March 16 (Reuters) - Commodity trader Glencore has pulled sizeable cobalt stocks from China's Wuxi ‌exchange to honour commitments to electric-vehicle battery makers in the country, due to limited supply of the material, two sources familiar with the matter said.
1 hour ago
Beijing Creative Distribution: Plans to Invest EUR 42.8137 million in the Construction of an Energy Storage Project
2 hours ago
Beijing Creative Distribution: Plans to Invest EUR 42.8137 million in the Construction of an Energy Storage Project
Read More
Beijing Creative Distribution: Plans to Invest EUR 42.8137 million in the Construction of an Energy Storage Project
Beijing Creative Distribution: Plans to Invest EUR 42.8137 million in the Construction of an Energy Storage Project
On March 11, 2026, the Company convened the 19th meeting of the eighth Board of Directors and approved the investment in and construction of the 99 MW/198 MWh energy storage project in Valcea, Romania through its third-tier holding subsidiary, Greenet Plant S.R.L. The total investment in this project will not exceed EUR 42.8137 million (the final total investment will be subject to the actual investment). The total investment amount involved is the planned investment scale and may be adjusted subsequently based on specific circumstances such as fundraising, project progress, and filing and approval procedures. There is a risk that the actual investment amount may differ from the investment plan.
2 hours ago