Downstream Demand Dominates Lead Price, Not Environmental Checks, SMM Reports

Published: Jul 20, 2017 16:35 (GMT+8)
ecent environmental protection inspections had little impact on primary lead and large secondary lead smelters with environmental permits, but affected small secondary lead smelters greatly.

SHANGHAI, Jul. 20 (SMM) – Recent environmental protection inspections had little impact on primary lead and large secondary lead smelters with environmental permits, but affected small secondary lead smelters greatly, SMM says. Small secondary lead smelters in Henan, Hebei, Shandong, Anhui, Jiangxi and Guangdong closed down.

SMM Survey: Will Environmental Checks Keep Striking Lead Market?

Ignition Battery Producers Cut Output by 20% amid High Temperature, SMM Reports

However, this made small ripples in lead price, which was still dominated by sluggish downstream demand.

In other news, secondary lead replacement of primary lead has reached 40% in 2016 and will grow to 50% in 2017, SMM notes. Compared to primary lead, secondary lead has lower cost and ample raw material supply. As such, secondary lead replacement of primary lead will be a tendency in a long term.

For news cooperation, please contact us by email: sallyzhang@smm.cn orservice.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
7 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
7 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
11 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Read More
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile Metals announced that its second rig had arrived at Tribag–West Wedge in New Brunswick, Canada, with drilling expected to begin at Tribag in the coming days. Seven modelled electromagnetic targets are associated with the Tribag lead-zinc and West Wedge copper-lead-zinc occurrences. Wedge drilling continues in parallel. By September 21, the company had completed 18 holes totaling 4,934.50 metres of its 10,000-metre annual program. The conductors remain geophysical targets requiring drilling to establish their source.
11 hours ago
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Oct 01, 2026 10:06 (GMT+8)
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Read More
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Masivo Silver reported assays from CC-26-001, its first hole at Cerro Colorado in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres averaging 0.271% zinc, 0.141% lead and 7.0 g/t silver. Technical difficulties ended drilling at 259.5 metres while the hole remained within mineralized rock.
Oct 01, 2026 10:06 (GMT+8)