LiCarbonate Daily - Market Update for May 14

Published: May 14, 2024 17:56
Source: SMM
On May 14, lithium carbonate futures fell 2.05% to 105,000 yuan/ton (~14,502.76 USD/ton). The battery-grade index dropped to 109,232 yuan/ton (~15,087.29 USD/ton).

Market Overview: On May 14, the lithium carbonate market experienced a continued decline across both spot and futures markets. The main 2407 futures contract dropped by 2.05%, while spot prices for battery-grade and industrial-grade lithium carbonate also fell.

Spot Market:

  • Battery-Grade Lithium Carbonate:
    • SMM index: 109,232 yuan per ton (~15,087.29 USD/ton), down by 354 yuan from the previous day.
    • Price range: 107,000 - 111,500 yuan per ton, with an average price of 109,250 yuan per ton (~15,089.78 USD/ton), down by 500 yuan.
  • Industrial-Grade Lithium Carbonate:
    • Price range: 105,500 - 106,500 yuan per ton, with an average price of 106,000 yuan per ton (~14,640.88 USD/ton), down by 750 yuan.

Futures Market: The main lithium carbonate 2407 contract opened at 106,750 yuan per ton (~14,744.48 USD/ton) and closed at 105,000 yuan per ton (~14,502.76 USD/ton). Trading volume reached 214,774 contracts, and open interest increased by 692 contracts to 198,922. Prices were stable in the morning session but dropped significantly in the afternoon before partially recovering.

Looking Forward:

  • Production and Sales:
    • Many lithium salt producers remain cautious about selling scattered orders, although they have slightly lowered their selling price expectations.
  • Purchasing Behavior:
    • Some downstream cathode producers report their procurement targets are still below the current market prices, but there have been small purchases at lower prices.
    • Several downstream enterprises indicate sufficient lithium carbonate inventories, acquired at lower prices, and plan to rely on stable long-term agreements for their monthly raw material needs, showing no immediate intent to replenish spot inventories.

* You can subscribe to LiCarbonate Daily and it will be sent to your email daily; To subscribe, simply send an email to me : robinhe@smm.cn *

If you have any questions regarding the recent movement of lithium carbonate market (e.g. what caused it and how this can affect your business), or would like to know more comprehensive pricing info on Lithium Carbonate. Please feel free to reach out to me:

Robin He

SMM Li-ion Battery Materials Department

E: robinhe@smm.cn | T: +86-21-51595884

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
6 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
6 hours ago