Minister of Economy of Chile: Time Is Urgent For The Nationalisation Of The Lithium Industry

Published: May 16, 2023 13:54
Source: SMM
SHANGHAI, May 16 (SMM) - Chilean Minister of Economy Nicolas Grau spoke for the first time on the "nationalisation of the lithium industry" and shared a series of possible follow-up progress.

SHANGHAI, May 16 (SMM) - Chilean Minister of Economy Nicolas Grau spoke for the first time on the "nationalisation of the lithium industry" and shared a series of possible follow-up progress. In an interview with the media, Grau said that National Copper Corporation of Chile (Codelco) will start dialogues with companies operating in the Atacama Salar Flats as soon as possible, especially SQM, whose mining contract expires in 2030.

In the process of nationalising the lithium industry, Chile's strategy also includes the establishment of a new state-owned lithium industry company. However, before the Congress approves the new state-owned enterprise, it has to rely on existing companies to promote the process.

More popular news

China’s Central Bank Releases Key April Economic Data: RMB Loans Issued to the Real Economy, Newly-Added Social Financing, Newly Added RMB Loans, Balance of M2, M1 and M0, All Recording Enormous Growth       

EIA Cuts Brent and WTI Oil Price Forecasts for 2023 as Recession Fears, Inflation and Banking Crisis Overshadow OPEC's Production Cuts

Chile’s Latest Move Marks One Step Closer to the Establishment of Lithium Version of OPEC

Global Chip Market Will Decline 20% This Year

SMM Comment (May 11): Non-Ferrous and Ferrous Metals Go Down, Oil Outperforms on Firm Fuel Demand in the World's Largest Oil Consumer, Dollar Climbs, US April CPI Data Triggers Financial Market Volatility           

IMF: Western Sanctions against Russia Are Ineffective, European Economy Faces Multiple Challenges    

Dollar, Oil, Gold, Base Metals, Ferrous Metals All Go Down, EIA Cuts Oil Price Forecast

Goldman Sachs, Barclays warn: Fed will not cut interest rates this year

India to become Europe’s top supplier of refined oil products after massive purchases of Russian oil     

China To Actively Expand Domestic Effective Demand And Boost New Energy Vehicle Sales, National Development And Reform Commission Says         


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago