Lithium Carbonate Prices Lost 10,000 Yyuan/mt in a Single Day and Fell below Lithium Hydroxide Prices

Published: Apr 22, 2022 11:01
Source: SMM
SHANGHAI, Apr 22 -According to SMM data, the spot prices of domestic battery-grade lithium carbonate fell further to 467,000-484,000 yuan/mt yesterday, with the average price down 10,000 yuan/mt.

SHANGHAI, Apr 22 -According to SMM data, the spot prices of domestic battery-grade lithium carbonate fell further to 467,000-484,000 yuan/mt yesterday, with the average price down 10,000 yuan/mt. Prices of domestic battery-grade lithium hydroxide also dropped to 473,000-484,000 yuan/mt, with a single-day drop of 6,000 yuan/mt.

The average spot price of battery-grade lithium carbonate (475,500 yuan/mt) was significantly lower than that of battery-grade lithium hydroxide (478,500 yuan/mt).

Growing domestic output and concentrated port arrivals after delayed shipments added to oversupply pressure. Demand continued to decline. Some small and medium-sized smelters cut offers further, but failed to attract buyers. Given poor demand, the price of lithium carbonate will still have room to fall.

Strong overseas demand encouraged large  lithium hydroxide smelters to hold offers firmly, but domestic demand was poor under the impact of pandemic.  The price of lithium hydroxide may decline slightly, dragged down by lithium carbonate prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
13 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
13 hours ago