Flat steel production to grow in January, while long steel output to fall

Published: Jan 9, 2020 15:01
Chinese steelmakers plan to produce 9.71 million mt of hot-rolled coils and plates in January, up 5.32% from December

SHANGHAI, Jan 9 (SMM) – Chinese steelmakers are sharply stepping up production of flat products but trimming that of long products this month, as flat steel enjoys wider profit margins.

The latest SMM survey showed that Chinese steelmakers plan to produce 9.71 million mt of hot-rolled coils and plates in January, up 5.32% from the realised output in December. January’s flat steel output increase is larger than that in December, pointing to mounting supply pressure. About 427,000 mt would be exported, up 5.4% from a month earlier, and volumes slated to enter domestic markets are likely to increase 5.3% to 9.28 million mt.

Planned production of long steel, including rebar and wire rods, however, will shrink 2.1% from December to 10.69 million mt, according to the SMM survey. Output for domestic sales is planned at 10.42 million mt this month, down 1.98% on the month, with scheduled exports also lower by 6.8% to 275,000 mt.

Chart: Flat steel-long steel production difference (Source: SMM)

Rebar was more profitable than hot-rolled coil for much of the past year. The rebar-HRC profit spread peaked in late November as prices of construction steel jumped on certain product supply shortages, which prompted some mills to cut production of flat products and shift to long products.

Strong supply, coupled with seasonally weakening demand, later led to a pullback in prices of long steel however. Prices of long steel have been on the decline since late December, while those of flat steel have been firm, supported by supply shortfalls. This drove HRC profits to exceed those on rebar, and encouraged steelmakers to recover flat steel production.

Chart: Flat steel-long steel profit spreads (Source: SMM)

On the back of the divergence in profits between flat and long products, more long steel producers chose to conduct maintenance this month, while there is barely any maintenance scheduled at flat steel producers. Driven by enticing profits and healthy orders, flat steel mills will operate at full capacity this month and some even plan to put additional blast furnaces into operation to help ramp up production.

With end-user demand grinding to a halt ahead of the Chinese New Year holiday which falls in late January this year, spot prices of flat steel are set to weaken amid high supply. Prices of long steel, meanwhile, are expected to hover in a tight range on weakness in both demand and supply.

Chart: Maintenance at flat steel mills or facility shutdown (10,000 mt)

Chart: Maintenance at long steel mills (10,000 mt)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
22 hours ago
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Read More
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
According to an announcement by NFC, on April 2, 2026, Zhongse Indonesia Dari Mining Co., Ltd., a holding subsidiary of China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd., obtained the "Environmental Feasibility Decision (SKKL) on Mining Activities of Lead-Zinc Ore by Dari Mining in SilimaPungga-Pungga Township, Dari County, North Sumatra Province" issued by the Ministry of Environment of the Republic of Indonesia. According to NFC's disclosure, the mine is an underground mine with a designed capacity of 1 million mt/year. As of 2024, the total resources/reserves of the Dari lead-zinc mine were: ore volume of 20.7009 million mt, zinc metal content of 2.2562 million mt, lead metal content of 1.3203 million mt, with an average zinc grade of 10.90% and an average
22 hours ago
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Apr 7, 2026 14:07
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Read More
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Recently, Inner Mongolia Shuangli Mining Co., Ltd. (hereinafter referred to as "Shuangli Mining") held the completion and trial production ceremony for the upgrading and capacity expansion project of the mining and beneficiation system at the No. 2 Iron Mine in the Geqi mining area.Once the project reaches full production, it will produce 870,000 mt of iron ore concentrates, 9,580 mt of copper concentrates, 5,432 mt of lead concentrates, and 2,052 mt of zinc concentrates annually, injecting new momentum into Shuangli Mining's green and high-quality development.
Apr 7, 2026 14:07
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Mar 24, 2026 17:21
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Read More
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
[Molybdenum-Iron Tender Information] SMM, March 24: It is reported that on March 23, a special steel group in east China announced the tender price for a new round of ferromolybdenum procurement, with the tax-inclusive plant-delivered acceptance-settled price at 277,500 yuan/mt, down 2,000 yuan/mt from the tender price on March 18. The public tender purchase volume was 120 mt (bid volume), while the actual total purchase volume remained to be determined.
Mar 24, 2026 17:21
Flat steel production to grow in January, while long steel output to fall - Shanghai Metals Market (SMM)