Antam Reports 33 Percent Drop in Ferronickel Output in First Quarter of 2017

Published: May 03, 2017 13:50 (GMT+8)
Antam released its operation report for the first quarter of 2017 ending Mar. 31.

SHANGHAI, May 3 (SMM) – Antam released its operation report for the first quarter of 2017 ending Mar. 31. 

According to the report released on its website, the company produced 2,934 tonnes of nickel contained in ferronickel (TNi), down 33 percent on a yearly basis. 

Antam to Restart Nickel Ore Exports in May after 3-Year Halt

The company attributed the drop mainly to roof replacement of its No. 3 electric smelting furnace and optimization of FeNi III ferronickel plant production facilities from end of 2016 to mid March 2017. 

The company said to strength its commitment to meet 2017 ferronickel production target of 24,100 tonnes (TNi). 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] IMIP’s water-related NPI cuts meet weak stainless steel demand
8 hours ago
[SMM Analysis] IMIP’s water-related NPI cuts meet weak stainless steel demand
Read More
[SMM Analysis] IMIP’s water-related NPI cuts meet weak stainless steel demand
[SMM Analysis] IMIP’s water-related NPI cuts meet weak stainless steel demand
IMIP’s RKEF NPI plants have begun cutting operating loads by 30–40% amid water shortages. Prolonged cuts could reduce cumulative NPI output by over 100 kt, equivalent to more than 11 kt of nickel at an 11% grade. Meanwhile, weak demand is expected to lower China’s October 300-series stainless output by over 100 kt. Elevated NPI inventories could cushion the initial impact, with price support depending on the disruption’s duration and downstream buying.
8 hours ago
Data: SHFE, DCE market movement (Sep 23)
9 hours ago
Data: SHFE, DCE market movement (Sep 23)
Read More
Data: SHFE, DCE market movement (Sep 23)
Data: SHFE, DCE market movement (Sep 23)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 23 Sep , 2026
9 hours ago
【SMM Nickel Flash】Indonesia Nickel Market Update — September 23, 2026
10 hours ago
【SMM Nickel Flash】Indonesia Nickel Market Update — September 23, 2026
Read More
【SMM Nickel Flash】Indonesia Nickel Market Update — September 23, 2026
【SMM Nickel Flash】Indonesia Nickel Market Update — September 23, 2026
Indonesia's nickel ore market remained stable on September 23, with SMM assessments for Indonesian nickel ore delivered to destination ports unchanged across major grades: Ni 1.2%: $26.5/wmt, unchanged. Ni 1.3%: $28.5/wmt, unchanged. Ni 1.4%: $51.8/wmt, unchanged. Ni 1.5%: $58.5/wmt, unchanged. Ni 1.6%: $63.4/wmt, unchanged. In the market, additional 2026 RKAB approvals are gradually entering the market, helping ease the earlier shortage of nickel ore. However, the total additional quota has yet to be officially announced, and the pace of quota execution remains a key factor for subsequent ore supply and smelter production. Meanwhile, El Niño-driven drought has emerged as a new supply-side concern. IMIP confirmed that water shortages have forced some smelters to reduce NPI production, although operations have not been halted.
10 hours ago