Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity-Shanghai Metals Market

Hot Keywords

  • Nickel
  • Nickel ore
  • Inventory data
  • Copper
  • Stainless steel
  • Rare earths
  • Aluminium
  • Macroeconomics
  • Zinc
  • Iron ore
  • Production data
  • Market commentary
  • Tin
  • Morning comments
  • Futures movement

Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity

Company News 09:54:24AM Dec 25, 2014 Source:SMM

SHANGHAI, Dec. 25 (SMM) – Bayannur Zijin Zinc reached its 200,000-tpy designed capacity after its production on Dec. 23, local media reported.    

The zinc smelter, owned by Zijin Mining Group, is located at Bayannur, Inner Mongolia in China.  

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity

Company News 09:54:24AM Dec 25, 2014 Source:SMM

SHANGHAI, Dec. 25 (SMM) – Bayannur Zijin Zinc reached its 200,000-tpy designed capacity after its production on Dec. 23, local media reported.    

The zinc smelter, owned by Zijin Mining Group, is located at Bayannur, Inner Mongolia in China.  

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.