Metals News
Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity
company news
09:54AM
Dec 25,2014
Source:SMM

SHANGHAI, Dec. 25 (SMM) – Bayannur Zijin Zinc reached its 200,000-tpy designed capacity after its production on Dec. 23, local media reported.    

The zinc smelter, owned by Zijin Mining Group, is located at Bayannur, Inner Mongolia in China.  

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
Zijin Mining Group Co.
Chinese news summary
For queries, please contact Frank LIU at liuxiaolei@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn
Related Price

No Data