SHANGHAI, Sept. 23 (SMM) - Zijin Mining entered trial production of its 3.3 million-tpy lead and zinc ore processing project in Inner Mongolia’s Urat Rear Banner recently, bynrnews.com reports.
The project was commenced in 2009, and is scheduled for commissioning in the latter half of this year. Once operational, its daily ore processing capacity will reach 10,000 tonnes. The project’s zinc ore output will be 70,000 tpy (zinc content), with lead ore output of 10,000 tpy (lead content) and 360,000 tpy of standard sulfur.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn