Home / Metal News / Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity

Newssummary: Zijin Mining’s 200,000-tpy Zinc Project Reaches Design Capacity

iconDec 25, 2014 09:54
Bayannur Zijin Zinc reached its 200,000-tpy designed capacity after its production on Dec. 23, local media reported.

SHANGHAI, Dec. 25 (SMM) – Bayannur Zijin Zinc reached its 200,000-tpy designed capacity after its production on Dec. 23, local media reported.    

The zinc smelter, owned by Zijin Mining Group, is located at Bayannur, Inner Mongolia in China.  

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
Zijin Mining Group Co.
Chinese news summary
Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market exchanges, and relying on SMM's internal database model, for reference only and do not constitute decision-making recommendations.

For queries, please contact Lemon Zhao at lemonzhao@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news