NBS: China refined copper output in March fell to 10-month low as COVID-19 disrupted production

Telah Terbit: Apr 21, 2020 13:19 (GMT+8)
China’s production of copper cathode in March dropped to the lowest level since May 2019, losing 2.5% from the same period last year to 771,000 mt, according to data from the National Bureau of Statistics (NBS) released on Monday.

SHANGHAI, Apr 21 (SMM) – China’s production of copper cathode in March dropped to the lowest level since May 2019, losing 2.5% from the same period last year to 771,000 mt, according to data from the National Bureau of Statistics (NBS) released on Monday.


Disrupted production due to the coronavirus outbreak accounted for the reduced output. 


Daily production of copper cathode in China averaged 24,870 mt in March, down from the daily average 25,450 mt in January-February. 


Domestic output of refined copper stood at 1.53 million mt in January-February, 2.8% higher year on year. The NBS did not release monthly data for January and February.


Overall copper cathode production in the first quarter amounted to 2.29 million mt, up 0.4% from the same period a year ago. 


NBS data also indicated that China’s production of zinc rose 4.7% on the year to 489,000 mt in March, with the output of lead climbing 2.2% to 467,000 mt. The production of zinc and lead for March was also the lowest monthly level since May 2019. 


Separately, China produced 5.88 million mt of alumina in March, 3.6% lower year on year. 

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
7 jam yang lalu
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Baca Selengkapnya
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Pemegang saham HCL menyetujui dua mekanisme penggalangan dana seiring perusahaan menerapkan program ekspansi Vision 2030. Rencana lima tahun ini menargetkan peningkatan kapasitas tambang melalui perluasan tambang yang ada, cadangan baru, dan revitalisasi aset lama.
7 jam yang lalu
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
8 jam yang lalu
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Baca Selengkapnya
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Dengan jadwal produksi AC yang membaik, survei SMM terhadap 13 produsen pipa tembaga menunjukkan libur Hari Nasional yang lebih singkat, rata-rata 3,3 hari—0,6 hari lebih sedikit dibandingkan tahun lalu. Empat produsen di Tiongkok Timur akan beroperasi sepanjang libur. Tingkat operasi Oktober diperkirakan stabil secara bulanan, dengan penurunan tahunan yang jauh lebih sempit. Namun, pesanan tetap lemah, sehingga kekuatan "Oktober Perak" masih belum pasti.
8 jam yang lalu
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
9 jam yang lalu
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
Baca Selengkapnya
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
9 jam yang lalu