SMM Morning Comments (Mar 23): Base metals opened broadly lower; Shanghai copper briefly hit ‘limit down’

Telah Terbit: Mar 23, 2020 09:44 (GMT+8)
London and Shanghai base metals traded lower across the board in early morning trade on Monday, extending declines from the prior week, as fears over the economic impact of the global coronavirus outbreak continue to weigh heavily on investor sentiment. The most active SHFE copper contract for May delivery plunged 8% to hit its “limit down” level at 35,300 yuan/mt shortly after the opening the bell.

SHANGHAI, Mar 23 (SMM) – London and Shanghai base metals traded lower across the board in early morning trade on Monday, extending declines from the prior week, as fears over the economic impact of the global coronavirus outbreak continue to weigh heavily on investor sentiment.

 

The most active SHFE copper contract for May delivery plunged 8% to hit its “limit down” level at 35,300 yuan/mt shortly after the opening the bell.

 

On Friday, LME base metals reversed earlier gains to close mostly lower, as the US dollar bounded back towards three-year highs. Aluminium plunged 3.2% on the day to lead the losses, copper tumbled 2.3%, tin fell 1.1%, lead shed 0.2% and zinc edged down less than 0.1%. Nickel gained 0.3%.

The SHFE kept its night trading session suspended.

 

On Sunday night US time, US stock futures and crude prices cratered after a coronavirus stimulus bill failed a key Senate procedural vote. Earlier in the session, stocks futures hit their “limit down” levels, falling 5%.

The greenback remained firm against a basket of currencies.

 

Copper: Three-month LME copper eased after hitting an intraday high of $4,938.5/mt in the European trading session, and finished the day substantially lower at $4,700/mt, posting a weekly loss of 13.8%.

 

Aluminium: Three-month LME aluminium reversed earlier gains to touch a new low in three years and a half at $1,575/mt, shortly before it ended the day sharply lower at $1,577/mt. It is likely to move between $1,540-1,620/mt today, with the most-active SHFE 2005 contract trading at 11,250-11,800 yuan/mt. East China spot discounts are seen at 70-40 yuan/mt against the SHFE 2004 contract.

 

Zinc: Three-month LME zinc notched an intraday high of $1,934.5/mt in early European trading hours, before it erased all those gains to end the day a tad lower at $1,845/mt. It remains under pressure at the five- and 10-day moving averages, but supported by the lower Bollinger band. Zinc stocks across LME-approved warehouses resumed their decline, decreasing 500 mt, or 0.68% to 73,200 mt on Friday. LME zinc is expected to trade at $1,810-1,860/mt today with the most-traded SHFE May contract hovering between 14,500-15,000 yuan/mt. Spot premiums for domestic 0# Shuangyan are seen at 20-40 yuan/mt over the SHFE April contract.

 

Nickel: Three-month LME nickel climbed past the five-day moving average and lower Bollinger band to an intraday high of $11,700/mt in early European trading hours, before it pared most of those gains to end the day higher at $11,330/mt. Whether it could remain above $11,000/mt will come under scrutiny.

 

Lead: Three-month LME lead climbed to an intraday high of $1,700/mt in early European trading hours, before it gave back all those gains to close the day lower at $1,635/mt.

 

Tin: Three-month LME tin plumbed a new more than one-decade trough of $12,715/mt in early Asian trading hours. It later rebounded through the five-day moving average to an intraday high of $14,500/mt, before easing to closing the day lower at $13,555/m to produce a weekly loss of 14.2%. Resistance is seen at $14,500/mt, while support lingers at $13,000/mt.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
7 jam yang lalu
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Baca Selengkapnya
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Hindustan Copper Memajukan Pendanaan Capex $776 Juta melalui QIP dan Obligasi untuk Ekspansi Visi 2030
Pemegang saham HCL menyetujui dua mekanisme penggalangan dana seiring perusahaan menerapkan program ekspansi Vision 2030. Rencana lima tahun ini menargetkan peningkatan kapasitas tambang melalui perluasan tambang yang ada, cadangan baru, dan revitalisasi aset lama.
7 jam yang lalu
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
8 jam yang lalu
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Baca Selengkapnya
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Survei Libur Hari Nasional 2026 Perusahaan Pengolahan Tembaga — Pipa Tembaga [Analisis SMM]
Dengan jadwal produksi AC yang membaik, survei SMM terhadap 13 produsen pipa tembaga menunjukkan libur Hari Nasional yang lebih singkat, rata-rata 3,3 hari—0,6 hari lebih sedikit dibandingkan tahun lalu. Empat produsen di Tiongkok Timur akan beroperasi sepanjang libur. Tingkat operasi Oktober diperkirakan stabil secara bulanan, dengan penurunan tahunan yang jauh lebih sempit. Namun, pesanan tetap lemah, sehingga kekuatan "Oktober Perak" masih belum pasti.
8 jam yang lalu
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
9 jam yang lalu
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
Baca Selengkapnya
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
HBIS Resources: Bagian utama proyek tembaga Fase II pada dasarnya telah selesai, saat ini dalam tahap peningkatan kapasitas
9 jam yang lalu