Gotion High-Tech Responds to U.S. Department of Defense Ban on Purchasing Batteries from Six Chinese Companies: No Impact on the Company

Published: Jan 30, 2024 17:57
“No impact on the company." From Gotion High-Tech in response to the new restriction posed by the US congress.

In response to the news that the U.S. Department of Defense is prohibited from purchasing batteries from six Chinese companies, Gotion High-Tech stated: The ban mainly targets the core battery supply of the U.S. Department of Defense, imposing restrictions on the procurement of batteries for military purposes by the Department, and does not affect civilian commercial cooperation. The company has not supplied to the U.S. Department of Defense and has no plans for such cooperation, therefore, there is no impact on the company. According to a report by Global Times on January 21, the U.S. Congress has prohibited the U.S. Department of Defense from purchasing batteries produced by six Chinese companies, including CATL and BYD. This regulation will take effect in October 2027 and is part of the National Defense Authorization Act for Fiscal Year 2024 passed at the end of last year. According to the provisions of the said act, besides CATL and BYD, Envision Energy, EVE Energy, Gotion High-Tech, and Sunwoda Electronic are also on the list.

f you have any questions regarding the industry data, or the news (e.g. how this can affect your business). Please feel free to reach out to me:

Robin He

SMM Li-ion Battery Materials Department

E: robinhe@smm.cn | T: +86-21-51595884

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Cobalt Product Prices Mostly Held Steady While Refined Cobalt and Cobalt Sulphate Quotes Continued to Edge Down: Where Is the Turning Point? [Weekly Review]
1 hour ago
Cobalt Product Prices Mostly Held Steady While Refined Cobalt and Cobalt Sulphate Quotes Continued to Edge Down: Where Is the Turning Point? [Weekly Review]
Read More
Cobalt Product Prices Mostly Held Steady While Refined Cobalt and Cobalt Sulphate Quotes Continued to Edge Down: Where Is the Turning Point? [Weekly Review]
Cobalt Product Prices Mostly Held Steady While Refined Cobalt and Cobalt Sulphate Quotes Continued to Edge Down: Where Is the Turning Point? [Weekly Review]
1 hour ago
220 kV Ru'an ESS Power Station in Shanxi Goes Operational
1 hour ago
220 kV Ru'an ESS Power Station in Shanxi Goes Operational
Read More
220 kV Ru'an ESS Power Station in Shanxi Goes Operational
220 kV Ru'an ESS Power Station in Shanxi Goes Operational
Recently, the 220 kV Ru'an ESS power station, located in the Linfen Economic Development Zone in Shanxi, successfully completed full-capacity grid connection testing and was officially put into operation. The project was invested and constructed by Linfen Ronglin Energy Storage Technology Co., Ltd., with a total investment of approximately 400 million yuan and covering an area of 50 mu. The ESS power station has a total installed capacity of 200 MW/400 MWh, adopts high-safety LFP battery technology, and consists of 80 prefabricated containerized energy storage units. The power station collects electricity through 35 kV collector lines and is connected to the 220 kV Feihong substation via a newly built 220 kV step-up station.
1 hour ago
Jiangsu Yonggang Group Launches Suzhou's Largest User-Side ESS Power Station
1 hour ago
Jiangsu Yonggang Group Launches Suzhou's Largest User-Side ESS Power Station
Read More
Jiangsu Yonggang Group Launches Suzhou's Largest User-Side ESS Power Station
Jiangsu Yonggang Group Launches Suzhou's Largest User-Side ESS Power Station
The user-side ESS power station of Jiangsu Yonggang Group was recently connected to grid and put into operation. With a capacity of 134.1 MW/260.8 megawatt hours, the station became the largest user-side energy storage project in operation in Suzhou. The project is expected to deliver an annual discharge of 120 million kWh, helping the enterprise save over 40 million yuan in electricity costs each year. In terms of technology, the commissioned energy storage project adopted LFP battery and string-type technology systems, covering an area of approximately 23 mu. The project operates on a core model of "peak shaving and valley filling," implementing a daily strategy of two charges and two discharges: charging and storing electricity during valley periods, and discharging to support production during the noon peak and evening peak periods. Through this approach, the project precisely matched the production load curve, not only maximizing economic benefits and energy utilization efficiency, but also significantly improving PV absorption rates and effectively promoting the integration of green electricity into the entire production process.
1 hour ago