The 10000t/d mineral processing system of Zijin Liba Gold Mine in Longnan was put into operation one month ahead of schedule.

Publicado: Dec 9, 2020 21:38

SMM News: December 1, Longnan Zijin Liba Gold Mine 10000t/d mineral processing system full line with material linkage test. After three days of operation and commissioning, the equipment and automation facilities are basically operating normally, and the handling capacity has reached the designed scale, one month ahead of schedule.

10000t/d Beneficiation system of Liba Gold Mine

In the process of project expansion, Longnan Zijin adopted a series of measures such as inverted construction period, wallchart command and on-site supervision to speed up the work of all aspects of the project and shorten the overall construction period to the maximum extent on the premise of ensuring the quality of the project. At the same time, the project persisted in cost control throughout the whole process of construction, and the total investment was reduced from 150.01 million yuan to 121.8 million yuan, resulting in an actual investment saving of more than 2800 million yuan.

Longnan Zijin is an important gold incremental project under Zijin Mining, with gold reserves of 172 tons and an average grade of 1.99 grams per ton. In the next step, Longnan Zijin will reach the standard and achieve an annual output of 40.5 tons of gold as soon as possible, becoming a new important growth pole of the domestic gold plate of Zijin Mining.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
The 10000t/d mineral processing system of Zijin Liba Gold Mine in Longnan was put into operation one month ahead of schedule. - Shanghai Metals Market (SMM)