Tender for the Procurement of 74 Items Including Copper Plates

Published: Sep 1, 2026 14:25

1. Procurement Conditions

This procurement project for 74 items including copper plates (PGPGCGHGXHD260831314453) has the purchaser as Pangang Group Sichuan Chengwu Zhifu Industrial Co., Ltd. The project funds come from self-raised sources. The project has met the procurement conditions and is now open for public inquiry-based procurement.

2. Project Overview and Procurement Scope

2.1 Project name: 74 items including copper plates

2.2 If procurement fails, switch to other procurement method: switch to negotiation procurement

2.3 For the procurement content, scope, and scale of this project, please refer to the attachment "Bill of Materials Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 This procurement requires bidders to meet the following qualification requirements:

See attachment (if necessary)

3.3 This procurement requires bidders to meet the following registered capital requirements:

Production-type registered capital: 2 million yuan or above

Distribution-type registered capital: 1 million yuan or above

3.4 This procurement requires bidders to meet the following performance requirements:

See attachment (if necessary)

3.5 This procurement requires bidders to meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: See attachment (if necessary)

Capability requirements: See attachment (if necessary)

Other requirements: 1. Provide valid enterprise qualification certificates: (1) scanned copy of business license (or duplicate); (2) scanned copy of tax registration certificate (or duplicate) (except for those with three-in-one certificates); (3) scanned copy of organization code certificate (or duplicate) (except for those with three-in-one certificates); 2. Performance requirements: None.

3.6 For projects that must be tendered according to law, bidders on the list of dishonest judgment debtors are invalid.

4. Acquisition of Procurement Documents

4.1 All those intending to participate in the bidding, please log in to the Ansteel Smart Tender and Bid Platform at http://bid.ansteel.cn from 14:00 on September 1, 2026 to 14:00 on September 9, 2026 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM survey] Profit pressure limits production resumption momentum, with limited room for hot metal growth in September
20 mins ago
[SMM survey] Profit pressure limits production resumption momentum, with limited room for hot metal growth in September
Read More
[SMM survey] Profit pressure limits production resumption momentum, with limited room for hot metal growth in September
[SMM survey] Profit pressure limits production resumption momentum, with limited room for hot metal growth in September
According to SMM survey data, the daily average pig iron production in August increased by more than 20,000 mt compared with July. The daily average hot metal production in September is expected to edge up.
20 mins ago
Liberty Steel Dalzell Resumes Rolling with Slabs Imported from Kazakhstan
32 mins ago
Liberty Steel Dalzell Resumes Rolling with Slabs Imported from Kazakhstan
Read More
Liberty Steel Dalzell Resumes Rolling with Slabs Imported from Kazakhstan
Liberty Steel Dalzell Resumes Rolling with Slabs Imported from Kazakhstan
GFG Alliance's Liberty Steel Dalzell plant in Motherwell, Scotland, has resumed rolling operations using steel slabs imported from Kazakhstan, after disruptions at British Steel's Scunthorpe plant prevented the originally planned slab sourcing. The 300,000-ton-capacity plant had been idle since August 2024 due to weak market conditions, with financing secured in February 2026 to restart production. GFG expects slab supplies from British Steel to resume later in the year. Dalzell has been selected to supply rolled steel for Navantia UK's Fleet Solid Support vessel program, with Liberty Steel reportedly securing an order for around 34,000 tons across three vessels, though slab supply issues had delayed the process.
32 mins ago
voestalpine's Donawitz Plant Advances Electric Arc Furnace Conversion
33 mins ago
voestalpine's Donawitz Plant Advances Electric Arc Furnace Conversion
Read More
voestalpine's Donawitz Plant Advances Electric Arc Furnace Conversion
voestalpine's Donawitz Plant Advances Electric Arc Furnace Conversion
Austrian steelmaker voestalpine has installed the main components of the two electric arc furnaces (EAF 1 and EAF 2) that will form the core of its new production line at the Donawitz plant, as announced on August 27. Installation of the furnaces' lower and upper shells, lids, rotary towers, lifting cylinders, and electrode arms is complete, while scrap transfer vehicle installation is underway. Part of voestalpine's "greentec steel" programme, the new EAF is expected to produce approximately 850,000 tonnes of CO₂-reduced steel annually, operating primarily on scrap and green electricity, with commissioning scheduled for the first half of 2027 alongside a similar unit at the company's Linz plant.
33 mins ago
Tender for the Procurement of 74 Items Including Copper Plates - Shanghai Metals Market (SMM)