Tesla Starts Megapack 3 Production in Texas

Published: Aug 6, 2026 18:31
Tesla's first Megapack 3 has rolled off the production line at its new Megafactory in Brookshire, Texas, marking the start of initial production at the site.

Tesla's first Megapack 3 has rolled off the production line at its new Megafactory in Brookshire, Texas, marking the start of initial production at the site.

The factory is designed for 50 GWh of annual capacity, representing a significant expansion of Tesla’s utility-scale energy storage manufacturing footprint. Each Megapack 3 provides approximately 5 MWh of AC energy, while four units can be integrated with a transformer and switchgear to form a 20 MWh Megablock.

Compared with the previous generation, Megapack 3 features a substantially simplified thermal system, with 78% fewer connections. Tesla also states that the Megablock platform can reduce installation time by 23% and construction costs by up to 40%.

Battery cell and supply-chain perspective: Megapack 3 adopts a new 2.8-liter large-format LFP cell platform, with cell supply spanning the United States, Southeast Asia and China. Tesla has not publicly disclosed the nominal Ah capacity of the new cell. However, based on market checks, the platform is moving into the 356 Ah cell class.

Chinese battery manufacturers are expected to remain central to Tesla’s near-term energy-storage supply chain. CATL has been reported as Tesla’s largest energy-storage battery supplier, while BYD and EVE Energy have also joined its supplier pool. At the same time, Tesla is accelerating localization through its Nevada LFP production line and its future U.S. supply agreement with LG Energy Solution.

Market Comment: The launch of Megapack 3 production is more than a manufacturing milestone. It reflects Tesla’s transition toward the 5 MWh product standard, larger-format LFP cells and a geographically diversified supply chain. Chinese cell manufacturers remain strategically important, although Tesla’s sourcing structure is becoming increasingly regionalized.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
5 hours ago
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
Read More
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
5 hours ago
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
5 hours ago
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
Read More
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
Zimbabwe's ability to attract and retain mining investment depends on maintaining economic stability, infrastructure development and access to long-term capital, according to Stanbic Bank Zimbabwe mining and metals VP Tania Mandaza. Zimbabwe's lithium export restrictions, aimed at encouraging domestic processing, are already influencing investor capital allocation. Beneficiation requires higher upfront capital than raw ore export, and the policy is expected to encourage consolidation, with smaller miners pursuing toll-processing arrangements, joint ventures or acquisitions with larger operators. Stanbic Bank Zimbabwe funds mine development and processing plants, including lithium facilities, ferrochrome smelters and PGM refineries, and participates in syndicated financing, trade finance, guarantees, letters of credit and working-capital facilities. Demand for longer-tenor structured project finance is rising, with some projects requiring terms of up to seven years strongest currently for gold mine expansions on higher gold prices, alongside growing requests for processing-plant financing. Power supply security remains a key focus for the sector. The government has directed miners to develop their own power solutions, and the bank is funding renewable-energy transactions as well as public-private partnerships for rail and logistics revival. Beyond lithium, Mandaza cites PGMs, gold, chrome and nickel as offering investment opportunities, with rare earths a longer-term prospect. Nickel demand is being driven by EV and battery markets. Zimbabwe's gold output rose from 38.5 t in 2024 to 50.5 t in 2025, with about 55 t targeted this year; gold prices near $4,000/oz are drawing investor interest in local assets. Proposed reforms the Mines and Minerals Bill and a digital mining permit system aim to provide regulatory certainty on mining rights, taxation, foreign-currency rules and export policy. ESG requirements, spanning green energy, water and tailings management, emissions, community development and governance, are increasingly factored into financing decisions. Chinese investment is expected to remain significant in Zimbabwe's lithium sector, with additional interest emerging from the Middle East, the Americas and India, as investors broaden into processing and manufacturing to secure critical mineral supply chains. The export restrictions are reshaping Zimbabwe's position in the global spodumene supply chain: raw concentrate available for export is constrained near-term as beneficiation capacity develops, while the country's export profile is expected to shift toward higher value processed lithium products over time.
5 hours ago
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
5 hours ago
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
Read More
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
On September 4th, ASX-listed Anson Resources has secured a $193 million business incentive from the Utah Inland Port Authority (UIPA) for its Green River lithium project, granted to subsidiary A1 Lithium. The incentive will be paid as a tax rebate over Green River's 20-year operating life, roughly $8 million a year, based on projected property tax revenue. UIPA has also offered an alternative bond-based structure to finance public infrastructure power, water, gas, rail and road upgrades needed to support the project. A combination of both options is possible, and Anson is exploring these structures as infrastructure upgrades are required for the planned 10,000 t/y lithium carbonate plant at Green River, which a March scoping study estimated at $569 million in total capital investment. The UIPA approval is separate from Anson's pending application to Utah's Governor's Office of Economic Development (GOED) for tax reduction support, due to be considered at GOED's September 10 board meeting. Anson said the incentive marks progress in assembling Green River's finance stack, as it continues pursuing pre-production financing options aimed at limiting shareholder dilution while supporting debt and strategic investment.
5 hours ago