SMM Analysis: Ternary Cathode Material Prices to Extend Declines in October

Published: Oct 10, 2024 11:03
Source: SMM
SMM, Oct 10: In September, the average price of 5-series ternary materials (polycrystalline/consumer type) was 102,000 yuan/mt, 6-series ternary materials (monocrystalline/power type) averaged 125,000 yuan/mt, and 8-series ternary materials (polycrystalline/consumer type) averaged 132,000 yuan/mt, all showing a decline from the previous month.

SMM, Oct 10: In September, the average price of 5-series ternary materials (polycrystalline/consumer type) was 102,000 yuan/mt, 6-series ternary materials (monocrystalline/power type) averaged 125,000 yuan/mt, and 8-series ternary materials (polycrystalline/consumer type) averaged 132,000 yuan/mt, all showing a decline from the previous month.

On the raw material side, in September, nickel sulphate prices decreased by 225 yuan/mt, cobalt sulphate prices decreased by 550 yuan/mt, manganese sulphate prices decreased by 215 yuan/mt, battery-grade lithium carbonate prices increased by 950 yuan/mt, and battery-grade lithium hydroxide (micro powder) prices decreased by 3,200 yuan/mt. The decline in sulphate prices was minimal, while battery-grade lithium carbonate prices rebounded due to a slight reduction in supply and some recovery in demand. However, battery-grade lithium hydroxide (micro powder) prices continued to show a significant downward trend. Transmitted to the ternary material side, high-nickel material costs continued to decrease. Currently, ternary materials are still in a situation of insufficient demand and oversupply, making it difficult to change the supply-demand pattern in the short term. The industry remains highly competitive, and price rebounds are challenging. It is expected that in October, ternary material prices will continue to fluctuate downward.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
3 hours ago
SMM Analysis: Ternary Cathode Material Prices to Extend Declines in October - Shanghai Metals Market (SMM)