LiCarbonate Daily - April 9th Update

Published: Apr 9, 2024 19:14
Source: SMM
Today's lithium carbonate market saw a modest increase, with the SMM index at 111,571 yuan/ton (~15,431.67 USD/ton) and futures rising by 0.44%, amid slight fluctuations.

Market Overview and Price Trends:

The SMM battery-grade lithium carbonate index slightly increased to 111,571 yuan/ton (~15,431.67 USD/ton), up by 6 yuan. Battery-grade lithium carbonate prices were between 110,500 yuan/ton (~15,283.54 USD/ton) and 113,500 yuan/ton (~15,698.48 USD/ton), with the average price at 112,000 yuan/ton (~15,491.01 USD/ton), marking a 150 yuan increase. Industrial-grade lithium carbonate saw prices range from 107,000 yuan/ton (~14,799.45 USD/ton) to 110,000 yuan/ton (~15,214.38 USD/ton), with the average reaching 108,500 yuan/ton (~15,006.92 USD/ton), up by 500 yuan.

Today's lithium carbonate market reflects cautious sentiment among producers and trading companies' interest in securing supplies, against a backdrop of just-in-time purchasing strategies from downstream enterprises. Despite the minimal price increase, the market is navigating through minor fluctuations, closely monitoring supply dynamics and downstream purchasing strategies.

Futures Market Movement:

The lithium carbonate (2407) main futures contract saw a 0.44% rise, opening at 114,000 yuan/ton (~15,767.63 USD/ton) and closing at 114,150 yuan/ton (~15,788.38 USD/ton). The trading volume reached 159,011 lots, with open interest marginally increasing by 400 lots to 184,198 lots. The day began with a notable decline in prices, followed by a recovery, indicating a volatile trading session but ultimately closing with a slight increase.

Concluding Insights:

The lithium carbonate market today demonstrates slight upward adjustments in both the spot and futures markets amidst ongoing cautious sentiment and strategic purchasing. With the lithium-ion battery industry maintaining a balance of robust supply and demand, the market's short-term trajectory is expected to continue with minor fluctuations, underpinned by strategic adjustments from both suppliers and buyers. ​

* You can subscribe to LiCarbonate Daily and it will be sent to your email daily; To subscribe, simply send an email to me : robinhe@smm.cn *

If you have any questions regarding the recent movement of lithium carbonate market (e.g. what caused it and how this can affect your business), or would like to know more comprehensive pricing info on Lithium Carbonate. Please feel free to reach out to me:

Robin He

SMM Li-ion Battery Materials Department

E: robinhe@smm.cn | T: +86-21-51595884

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
4 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 hours ago
LiCarbonate Daily - April 9th Update - Shanghai Metals Market (SMM)