Costs of DMC Trend Lower

Published: Mar 31, 2023 11:22
Source: SMM
Costs of DMC also trended lower.

SHANGHAI, Mar 31 (SMM) - Costs of DMC also trended lower. As of March 30, the average price of #421 silicon (for silicone) in east China was 18,000 yuan/mt, down 250 yuan/mt WoW, and that of methyl chloride in Shandong stood at 2,550 yuan/mt, down 300 yuan/mt WoW.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Polysilicon Prices Remained Stable Before the Holiday, Wafer Production Schedule Slightly Declined [SMM Silicon-Based PV Morning Meeting Minutes]
10 hours ago
Polysilicon Prices Remained Stable Before the Holiday, Wafer Production Schedule Slightly Declined [SMM Silicon-Based PV Morning Meeting Minutes]
Read More
Polysilicon Prices Remained Stable Before the Holiday, Wafer Production Schedule Slightly Declined [SMM Silicon-Based PV Morning Meeting Minutes]
Polysilicon Prices Remained Stable Before the Holiday, Wafer Production Schedule Slightly Declined [SMM Silicon-Based PV Morning Meeting Minutes]
[SMM Silicon-Based PV Morning Meeting Minutes] Polycrystalline silicon N-type recharging polysilicon quotes 48.5-58.8 yuan/kg, granular polysilicon quotes 49-51 yuan/kg, the polysilicon price index is 52.6 yuan/kg, polysilicon prices rise slightly, mainly due to some manufacturers being affected by cost delineation subsequently raising expectations slightly, mainstream prices remain stable. Approaching Chinese New Year, market transactions slow down, overall atmosphere shows no significant changes.
10 hours ago
Space PV Stimulates Market Sentiment to Heat Up, PV Commercialization Faces a Long and Arduous Path [SMM Analysis]
Feb 10, 2026 11:54
Space PV Stimulates Market Sentiment to Heat Up, PV Commercialization Faces a Long and Arduous Path [SMM Analysis]
Read More
Space PV Stimulates Market Sentiment to Heat Up, PV Commercialization Faces a Long and Arduous Path [SMM Analysis]
Space PV Stimulates Market Sentiment to Heat Up, PV Commercialization Faces a Long and Arduous Path [SMM Analysis]
[SMM Analysis: Space PV Stimulates Market Sentiment to Heat Up, Yet the Path to PV Commercialization Remains Long] On January 22, Musk strongly endorsed space PV during the World Economic Forum annual meeting in Davos, Switzerland, and disclosed key capacity plans. Musk stated that SpaceX and Tesla are simultaneously advancing solar capacity expansion, aiming to achieve an annual solar manufacturing capacity of 100 GW within the next three years to power ground-based data centers and space AI satellites. Following the earlier visit by Musk's SpaceX team to China to meet with Chinese PV enterprises, market sentiment in the PV sector further rose.
Feb 10, 2026 11:54
[SMM PV News] Greece Launches First ’Apollo‘ Auctions for 600 MW Renewable Capacity; Solar-Storage Capped at €80/MWh
Feb 10, 2026 09:12
[SMM PV News] Greece Launches First ’Apollo‘ Auctions for 600 MW Renewable Capacity; Solar-Storage Capped at €80/MWh
Read More
[SMM PV News] Greece Launches First ’Apollo‘ Auctions for 600 MW Renewable Capacity; Solar-Storage Capped at €80/MWh
[SMM PV News] Greece Launches First ’Apollo‘ Auctions for 600 MW Renewable Capacity; Solar-Storage Capped at €80/MWh
Greece's energy regulator (RAAEY) has initiated the first auctions under the ’Apollo Program‘, tendering 200 MW of solar-plus-storage and 400 MW of wind capacity to lower electricity costs for low-income households. The single-step static auction requires developers to submit bids by March 16, with maximum strike prices set at €80/MWh for solar-storage projects and €75/MWh for wind. Winning projects will secure 20-year Contracts for Difference (CfDs) and must be grid-ready by December 31, 2027. To ensure competition, the regulator mandates a 40% oversubscription rate and limits any single bidder to 25% of the total capacity. A second phase targeting municipalities is expected later this year.
Feb 10, 2026 09:12