Bearish Macro Front and Fundamentals to Put Aluminium Prices at Downside Risk

Published: Mar 13, 2023 14:17
Source: SMM
SHANGHAI, Mar 13 (SMM) - On the macro front, the US dollar index hit a three-month high after US Federal Reserve Chairman Powell warned that the pace of interest rate hikes may be accelerated.

SHANGHAI, Mar 13 (SMM) - On the macro front, the US dollar index hit a three-month high after US Federal Reserve Chairman Powell warned that the pace of interest rate hikes may be accelerated. The Chinese government made efforts to promote economic recovery and maintain market confidence. The governor of the People’s Bank of China (PBOC) said that the PBOC will implement a sound monetary policy to create a suitable monetary and financial environment for high-quality economic development. The National Development and Reform Commission (NDRC) stated that it will make greater efforts to stabilise the supply and prices of commodities, and is confident in achieving the CPI target for this year. The Minister of Housing and Urban-Rural Development expressed confidence in the stabilisation of the real estate market.

In terms of fundamentals, aluminium smelters in Sichuan and Guizhou continued to resume production, but the pace was slow. Guangyuan Aluminium was basically in full production, while Guizhou Xingren Denggao’s new capacity ramped up. Orders and operating rates in downstream sectors barely changed, except for a slight increase in extrusion and secondary alloy sectors. Orders for industrial extrusion from the photovoltaic segment were relatively optimistic, while orders received by secondary alloy producers fell short of market expectations. Production of primary alloy producers will hardly grow amid poor end consumption, while the increase in operating rates of aluminium plate/sheet, strip and foil producers will be constrained by tepid demand recovery. The domestic aluminium ingot social inventory fell slightly, which was contributed by south China and Gongyi. The inventory pressure in Wuxi remained high.

The market generally expects US interest rate hikes. The US non-farm payrolls and inflation data will be released soon, keeping the macro sentiment cautious. If the non-farm payrolls data exceeds expectations, aluminium prices will come under downward pressure. The positive impact from aluminium production reduction in Yunnan has receded, while downstream operating rates rose very slowly in the peak season. Coupled with stubbornly high social inventories and diminished cost support, aluminium prices will face downside risk. The most-traded SHFE aluminium contract and LME aluminium are likely to move between 17,800-18,800 yuan/mt and $2,230-2,430/mt respectively this week.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Chalco's $1.82B Aluminum Foil Project 40% Complete, Aims for 2027 Operation and $4B Output
36 mins ago
Chalco's $1.82B Aluminum Foil Project 40% Complete, Aims for 2027 Operation and $4B Output
Read More
Chalco's $1.82B Aluminum Foil Project 40% Complete, Aims for 2027 Operation and $4B Output
Chalco's $1.82B Aluminum Foil Project 40% Complete, Aims for 2027 Operation and $4B Output
The total investment of the Chalco Aluminum Foil New Energy High-Precision Plate, Sheet, Strip and Foil Project is RMB 1.82 billion, and physical progress has currently reached 40%. The roofing of the factory building will be completed by June 30 this year, and equipment commissioning and acceptance will be finished by month-end December, followed by trial production. It is understood that the project is expected to be officially completed and put into operation on May 31, 2027. After commissioning, it will achieve an annual output of 170,000 mt of high-precision aluminum plate/sheet, strip and foil, primarily used for the positive electrode current collectors of high-end power batteries, with an output value projected to reach 4 billion yuan.
36 mins ago
Huaibei High-tech Zone Signs Deal for Advanced Aluminum Composite Materials Project
36 mins ago
Huaibei High-tech Zone Signs Deal for Advanced Aluminum Composite Materials Project
Read More
Huaibei High-tech Zone Signs Deal for Advanced Aluminum Composite Materials Project
Huaibei High-tech Zone Signs Deal for Advanced Aluminum Composite Materials Project
On the morning of June 2, a project with an annual capacity of 30,000 mt of aluminum-based metal composite materials and 5 million pieces of deep-processed material products was signed in Huaibei High-tech Zone. The project integrates new material R&D, intelligent manufacturing, and precision deep processing. Its products are mainly applied in NEVs, energy storage equipment, PV, wind power, and other fields.
36 mins ago
Yunnan Hongtai's Aluminum Electrolysis Project Passes Verification, Publicity Period Announced
38 mins ago
Yunnan Hongtai's Aluminum Electrolysis Project Passes Verification, Publicity Period Announced
Read More
Yunnan Hongtai's Aluminum Electrolysis Project Passes Verification, Publicity Period Announced
Yunnan Hongtai's Aluminum Electrolysis Project Passes Verification, Publicity Period Announced
The Capacity Replacement Scheme for the Aluminum Electrolysis Construction Project of Yunnan Hongtai New-type Materials Co., Ltd. (Announcement No. 18 of 2019 by the Department of Industry and Information Technology of Yunnan Province) was publicly announced on December 26, 2019. The construction project planned to build six potlines, A, B, C, D, E, and F, to be constructed in phases and commissioned in sections. On January 25, 2021, two cells in Potline C (cell numbers 3344# and 3444#) passed the verification and acceptance conducted by experts organized by the provincial, prefectural, and county industry and information technology authorities, and were found to comply with the requirements of the Capacity Replacement Scheme for the Aluminum Electrolysis Construction Project of Yunnan Hongtai New-type Materials Co., Ltd. However, because they were located at the end of the second section and too close to the short-circuit busbar of the three-way corridor, the electromagnetic field stability was extremely poor. After the capacity replacement and verification in January 2021, they were not operated. The two cells in Potline D and the two cells in Potline C are all NEUI440kA electrolysis cells, each with a capacity of 2,405 mt, consistent with the construction content specified in the scheme. The Wenshan Prefecture Bureau of Industry and Information Technology, jointly with Yanshan County, conducted a verification and acceptance of the implementation of the capacity replacement scheme for the Aluminum Electrolysis Construction Project of Yunnan Hongtai New-type Materials Co., Ltd. (involving two units in the second section of Potline D). We hereby publicize the changes in the implementation of the capacity replacement scheme. The publicity period is from June 3 to June 7, 2026. During the publicity period, if there are any objections, please report them to the Wenshan Prefecture Bureau of Industry and Information Technology. Public supervision is welcomed.
38 mins ago