705,400 New Energy Passenger Vehicles with Insurance were Insured in December 2022

Published: Jan 19, 2023 11:04
Source: SMM
According to statistics, 705,400 units of new energy passenger vehicles were insured in December 2022, a sharp increase of 46% from 481,000 units in the same period last year, and 32% from November.

SHANGHAI, Jan 19 (SMM) - According to statistics, 705,400 units of new energy passenger vehicles were insured in December 2022, a sharp increase of 46% from 481,000 units in the same period last year, and 32% from November. The sales of new energy passenger vehicles with insurance were 5.22 units in 2022, a year-on-year increase of 80%. In terms of fuel types, 517,000 pure electric vehicles were insured, accounting for 73% of the total, an increase of 33% month-on-month, and up 30% year-on-year; while 188,000 plug-in hybrid vehicles were insured, accounting for 27%, a substantial increase of 124% year-on-year and a growth of 28% month-on-month. In January 2023, due to the expiry of some favourable policies and the approaching Chinese New Year, the terminal prices continued to decline, which stimulated the demand of consumers. But the overall growth rate is expected to be slower than the previous month.

In terms of performance of car companies, the top 15 NEV companies sold a combined 536,000 vehicles, up 25% month-on-month, and 53% year-on-year, and the market share of CR15 was 76%. BYD insured 216,000 units in December, up 23% month-on-month and 128% year-on-year. Tesla insured 41,000 unites in December in China, down 33% MoM and 41% YoY. Fengsheng Automotive insured 12,000 vehicles in December, a month-on-month increase of 382%, and a year-on-year increase of 1090%.

BYD insured 49,000 units of Song PLUS, up 41% month-on-month and 132% year-on-year. 29,000 units of Tesla Model Y were insured, down 44% month-on-month, and 14,000 units of Fengshen E70 were insured, a year-on-year increase of 88%. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago