Yangguang Power: Net Profit of the First Quarter was 411 Million Yuan, up 6.26% Year-on-Year

Published: Apr 20, 2022 11:44
Source: SMM
During the first quarter, the company realised operating income of 4.568 billion yuan, a year-on-year increase of 36.48%; net profit of 411 million yuan, a year-on-year increase of 6.26%.

SHANGHAI, Apr 20(SMM) - Photovoltaic giants Yangguang Power released its report for the first quarter of 2022. During the first quarter, the company realised operating income of 4.568 billion yuan, a year-on-year increase of 36.48%; net profit of 411 million yuan, a year-on-year increase of 6.26%. The basic earnings per share was 0.28 yuan. On the same day, Yangguang Power released its 2021 annual report. In 2021, the company achieved operating income of 24.137 billion yuan, a year-on-year increase of 25.15%. Net profit attributable to parent company stood at 1.583 billion yuan, a year-on-year decrease of 19.01%. Net profit attributable to parent company excluding non-recurring gains and losses was 1.335 billion yuan, a year-on-year decrease of 27.72%. The basic earnings per share was 1.08 yuan, a year-on-year decrease of 19.40%. As the results did not meet expectations, Yangguang Power has hit limit down as of the published date.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
16 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago
Yangguang Power: Net Profit of the First Quarter was 411 Million Yuan, up 6.26% Year-on-Year - Shanghai Metals Market (SMM)