SMM Evening Comments (Jul 2): SHFE base metals closed mostly higher amid coronavirus vaccine hopes

Published: Jul 02, 2020 17:36 (GMT+8)
Nickel advanced 0.7% to lead the way higher, copper rose 0.6%, aluminium gained 0.2% and zinc inched up 0.1%, while tin stayed flat. Lead shed 0.2%.

SHANGHAI, Jul 2 (SMM) – SHFE nonferrous metals closed higher for the most part on Thursday, as market sentiment was elevated by positive news surrounding the development of a potential coronavirus vaccine and upbeat economic data.

 

Nickel advanced 0.7% to lead the way higher, copper rose 0.6%, aluminium gained 0.2% and zinc inched up 0.1%, while tin stayed flat. Lead shed 0.2%.

 

On the LME, the nonferrous complex, except for aluminium, were higher at 17:36 Beijing time.

 

The closely-watched monthly US nonfarm payroll report is set to be released Thursday at 8:30 a.m. ET. Meanwhile, the weekly jobless claims data will also be released tonight.

 

US markets will be closed on Friday for the July Fourth holiday.

 

Copper: The most-traded SHFE August contract steadied after hitting its highest since mid-January at 49,570 yuan/mt in early morning trade, and finished the day 0.63% higher at 49,410 yuan/mt. The strong rally in copper prices was primarily propelled by concerns over mine supply as the coronavirus rages on in the top producer Chile.

Miner BHP said Wednesday it would begin to ramp down activity at its small Cerro Colorado copper mine in Chile.

Data from China customs showed that China’s imports of copper ore and concentrate dropped in May as the anti-virus lockdown measures began to take their toll.

Chilean copper miner Antofagasta has agreed to supply Chinese smelters Tongling Nonferrous and Jiangxi Copper with copper concentrates in the first half of 2021 at treatment and refining charges (TC/RCs) of $60.8/mt and 6.08 cents/lb.

 

Aluminium: The most-liquid SHFE August contract slipped to a session-low of 13,920 yuan/mt before recovering some ground to end up 0.22% at 13,965 yuan/mt.

SMM data showed that social inventories of primary aluminium ingots in China continued to fall this week, while those of aluminium billet rebounded.

 

Zinc: The load-up of long positions lifted the most-active SHFE August contract to a session-high of 16,815 yuan/mt, recouping its earlier losses, before the contract closed a tad higher at 16,775 yuan/mt. SHFE zinc remains rangebound after stemming its pull-back as investors weigh deteriorating fundamentals—weakening consumption in a low season, recovering supply from mines on seasonality and increasing supply from smelters on widening margins—against macro optimism. The contract is expected to continue to move sideways tonight.

 

Nickel: The most-traded SHFE August contract reversed an earlier slip to a session-high of 102,850 yuan/mt, before closing up 0.72% higher at 102,750 yuan/mt. With little change to its weak fundamentals, SHFE nickel is expected to continue to hover around moving averages above the 100,000 mark in the short term.

 

Lead: The liquidation of long positions forced the most active SHFE August contract to give up overnight gains and dive into negative territory, which touched a session-low of 14,710 yuan/mt before ending down 0.24% at 14,790 yuan/mt. The contract has yet to fall below the five-day moving average, and is expected to continue to hover above that level tonight.

                                                                      

Tin: The most-liquid SHFE September contract rose, paring overnight losses, to close flat at 138,350 yuan/mt. Support is seen at 137,000, while pressure is at 139,500.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)