Home / Metal News / Steel & Iron Ore / All Steel Plants in Handan Forced to Halt Pellet Shaft Furnace and Sintering Machine
All Steel Plants in Handan Forced to Halt Pellet Shaft Furnace and Sintering Machine
Sep 19,2017 10:06CST
industry news
Source:SMM
Handan government decided to suspend all pellet shaft furnaces and sintering machines at local steel plants from September 18 for air quality.

SHANGHAI, Sept. 9 (SMM) - Handan government decided to suspend all pellet shaft furnaces and sintering machines at local steel plants from September 18 for air quality.

When they will be allowed to restart these facilities is still indeterminate.

Tonghua Iron & Steel Delays Restart Plan on Environmental Protection, SMM Reports

Besides, all local foundry plants and carbon plants are also required to shut down.

Chengde Iron & Steel to Dismantle One Blast Furnace in Late September

Coking production is prolonged over 48 hours. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

steel plants
coking
carbon

For queries, please contact Frank LIU at liuxiaolei@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news

    timeApr 28, 2020 06:09timezoneCST
    timeApr 26, 2020 22:49timezoneCST
    timeApr 26, 2020 18:25timezoneCST
    timeApr 26, 2020 18:16timezoneCST
    timeApr 26, 2020 16:55timezoneCST
    timeApr 26, 2020 15:28timezoneCST
    timeApr 26, 2020 15:13timezoneCST
    timeApr 25, 2020 10:48timezoneCST
    timeApr 25, 2020 09:46timezoneCST
    timeApr 25, 2020 00:00timezoneCST