Home / Metal News / Zhejiang Dinas Plants Close down on Environmental Checks, Slashing Operation at Construction Sites, SMM Reports

Zhejiang Dinas Plants Close down on Environmental Checks, Slashing Operation at Construction Sites, SMM Reports

iconAug 22, 2017 13:32
Source:SMM
Zhejiang has called many dinas plants to shut down for environmental checks, tightening raw material supply of premixed concrete.

SHANGHAI, Aug. 22 (SMM) – Zhejiang has called many dinas plants to shut down for environmental checks, tightening raw material supply of premixed concrete. Dinas plants may even stop supplying goods at any time.

China Vows to Fight Air Pollution in Beijing, Tianjin, Hebei and Nearby Regions

The inspection will last about 20 days, SMM learns. However, the news has not affected market yet, as construction sites usually build raw material stocks for 3-5 days. The impact will increase in the second half of week with raw material consuming.

China Excavator Sales to Jump 80% YoY in September, Despite of Environmental Checks

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

steel prices
ferrous metals

For queries, please contact Michael Jiang at michaeljiang@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news

SMM Events & Webinars

All