JXTG Holdings Lowers Annual Output Target for 2017 at Its Chilean Copper Mine

Published: Aug 09, 2017 14:49 (GMT+8)
JXTG Holdings announced to lower copper output target for 2017 at its Caserones copper mine in Chile, as power cut suspended output in May.

SHANGHAI, Aug. 9 (SMM) – JXTG Holdings announced to lower copper output target for 2017 at its Caserones copper mine in Chile, as power cut suspended output in May.

Why China Unwrought Copper and Copper Semis Imports Down in January-July? SMM Reports

The company expects copper concentrate output to be 110,000 tonnes on March 31, 2018 fiscal year, which was lower than anticipation of 130,000 tonnes in May.

China Copper Cathode Output Falls in July, and to Rise in August, SMM Reports

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Escondida strike risk heats up, ore supply disruptions intensify [SMM Copper Morning Meeting Summary]
7 mins ago
Escondida strike risk heats up, ore supply disruptions intensify [SMM Copper Morning Meeting Summary]
Read More
Escondida strike risk heats up, ore supply disruptions intensify [SMM Copper Morning Meeting Summary]
Escondida strike risk heats up, ore supply disruptions intensify [SMM Copper Morning Meeting Summary]
SMM Morning Commentary: Overnight LME copper opened at $14,697.5/mt, initially touched a high of $14,708/mt, then drifted lower, dipping to $14,563.5/mt near the end of the session, and finally settled at $14,615.5/mt, down 1.13%. Trading volume reached 19,700 lots, and open interest stood at 263,900 lots, down 137 lots from the previous trading day, reflecting long liquidation. Overnight the most-traded SHFE copper 2610 contract opened at 110,790 yuan/mt, initially rose to 111,160 yuan/mt, then the price center moved straight down to a low of 110,560 yuan/mt, followed by wild swings before finally settling at 110,770 yuan/mt, down 0.5%. Trading volume reached 23,700 lots, and open interest stood at 123,500 lots, down 6,559 lots from the previous trading day, reflecting long liquidation.
7 mins ago
Copper prices consolidate and pull back domestically and internationally as a stronger US dollar weighs on copper [SMM Copper Morning Comment]
20 mins ago
Copper prices consolidate and pull back domestically and internationally as a stronger US dollar weighs on copper [SMM Copper Morning Comment]
Read More
Copper prices consolidate and pull back domestically and internationally as a stronger US dollar weighs on copper [SMM Copper Morning Comment]
Copper prices consolidate and pull back domestically and internationally as a stronger US dollar weighs on copper [SMM Copper Morning Comment]
20 mins ago
Escondida Copper Mine Fully Halts Operations After Fatal Accident; Restart Awaits Regulatory Clearance
2 hours ago
Escondida Copper Mine Fully Halts Operations After Fatal Accident; Restart Awaits Regulatory Clearance
Read More
Escondida Copper Mine Fully Halts Operations After Fatal Accident; Restart Awaits Regulatory Clearance
Escondida Copper Mine Fully Halts Operations After Fatal Accident; Restart Awaits Regulatory Clearance
BHP’s Escondida copper mine in Chile’s Atacama Desert announced on September 23 that a contractor was killed in an accident involving a front-end loader during equipment maintenance. All operations at the mine were subsequently suspended. Escondida expects copper production to reach up to 1.26 million tonnes in fiscal 2026. Chile’s mining regulator Sernageomin has dispatched personnel to investigate the incident. Under local procedures, operations cannot resume after a fatal accident until inspectors confirm that the site is safe. No restart timeline has been provided. Meanwhile, Escondida’s supervisors’ union is preparing to mobilise members to reject the latest wage proposal. The combination of labour uncertainty and the production halt has increased near-term supply risks.
2 hours ago