Home / Metal News / Steel & Iron Ore / Ansteel Undertakes Maintenance at Medium Plate Production Line
Ansteel Undertakes Maintenance at Medium Plate Production Line
Aug 7,2017 10:24CST
industry newscompany news
Source:SMM
Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

SHANGHAI, Aug. 7 (SMM) - Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

Higher Profit Stimulates Hot-Rolled Coil Production, China Deepens “Ditiao Steel” Elimination Inspections

About 36,000 tonnes of medium plate output will be affected. 

Shandong Laigang to Undertake Near 4-Month Maintenance at Blast Furnace in September, SMM Reports

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Ansteel Group
steel

For queries, please contact Frank LIU at liuxiaolei@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news

    timeApr 28, 2020 06:09timezoneCST
    timeApr 26, 2020 22:49timezoneCST
    timeApr 26, 2020 18:25timezoneCST
    timeApr 26, 2020 18:16timezoneCST
    timeApr 26, 2020 16:55timezoneCST
    timeApr 26, 2020 15:28timezoneCST
    timeApr 26, 2020 15:13timezoneCST
    timeApr 25, 2020 10:48timezoneCST
    timeApr 25, 2020 09:46timezoneCST
    timeApr 25, 2020 00:00timezoneCST