China Base Metal Output Data in June 2017, SMM Exclusive Data

Published: Jul 10, 2017 09:48
SMM surveys major producers in China’s base metal market every month to get first-hand production data, and the following table shows latest output data for June 2017.

SHANGHAI, Jul. 10 (SMM) – SMM surveys major producers in China’s base metal market every month to get first-hand production data, and the following table shows latest output data for June 2017.

 

Jun. (Preliminary Data)

YoY

Jan.- Jun.

 

YoY

May

(Final Data)

Jul. (E)

Copper cathode

654

1.08%

3832.5

0.67%

625

648

Alumina

5661

16.4%

33669

21.2%

5678

5901

Aluminum

3091

20.2%

18296

21.7%

3173

3193

Primary lead

231.873

-5.31%

1390.803

-9.6%

233.23

229

Refined zinc

457

-0.8%

2590

-2.5%

419.7

457

Refined nickel

12.6

-20%

76

-14%

12.5

12.2

NPI

32

-7.1%

188.7

1.99%

27.4

33.8

Refined tin

15.5

-1.4%

89

8.3%

13.7

15.3

Source: SMM

Unit: 1,000 tonne

Notes: 1. Data in final column (marked with an asterisk) has been revised. 2. NPI output refers to output in Ni content.

Copper

China Copper Output Advances in June, SMM Reports

Aluminum

China Aluminum Output Growth to Slow Down YoY in July, SMM Reports

Lead

China Primary Lead Output Edges down in June, and to Keep Falling in July, SMM Reports

Zinc

China Zinc Output Skyrockets in June, SMM Reports

Nickel

China Posts Declines in Refined Nickel Output Jan.-Jun. 2017, SMM Reports

NPI

China NPI Production to Grow in July, SMM Reports

Tin

China Refined Tin Output to Drop in July, SMM Forecasts

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
8 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
8 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
8 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
8 hours ago