Collections of Stories in Base Metal Market at SMM 2017 Lead&Zinc Summit

Published: May 22, 2017 13:14
Major stories in SMM 2017 Lead&Zinc Summit.

SHANGHAI, Mar 22 (SMM) – Hundreds of market players in base metals market, including mine owners, smelters, traders, downstream producers, bankers, participated in SMM 2017 Lead&Zinc Summit on May 20 in Yunnan.

The followings are major stories in lead and zinc markets during the meeting. 

Zinc 

SMM 2017 Lead & Zinc Summit: Zinc Price Outlook for 2017

SMM 2017 Lead & Zinc Summit: Zinc Oxide Demand to Lack Ability to Grow in 2017

SMM 2017 Lead & Zinc Summit: China to See 1.15 Mln tonnes Imported Zinc Concentrate Inflows in 2017

SMM 2017 Lead & Zinc Summit: China Zinc Concentrate Output to Add 200,000 tonnes in 2017

SMM 2017 Lead & Zinc Summit: China Zinc Output to Fall 80,000 tonnes in 2017

SMM 2017 Lead & Zinc Summit: Outlook of Zinc Downstream Industries

SMM 2017 Lead & Zinc Summit: Industry Insiders’ Takes on Zinc Price Perform in 2017 & 2018?

SMM 2017 Lead & Zinc Summit: Will Zinc Concentrate Remain in Deficit in 2017?

SMM 2017 Lead & Zinc Summit: How Will Zinc Industry Weather Central Government Checks?

Lead

SMM 2017 Lead & Zinc Summit: Lead Ore Production to Reduce on Environmental Checks

SMM 2017 Lead & Zinc Summit: Lead Smelters Face Difficulties

SMM 2017 Lead & Zinc Summit: Where Lead Price to Go in the Rest of Year after Plunge?

2017 Lead&Zinc Market Polling Results: Zinc Price to Move below 20,000 Yuan, and Lead Price to Trade at 15,000-17,500 Yuan

SMM 2017 Lead & Zinc Summit: Lead Price to Up to 17,500 Yuan in Second Half of 2017

For news cooperation, please contact us by email: sallyzhang@smm.cn orservice.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
1 hour ago
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Read More
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
On September 9, Nicola Mining announced completion of an underground assessment of the Treasure Mountain silver-lead-zinc mine (~30 km NE of Hope, BC, Canada) by independent engineering firm McElhanney, advancing the 2027 resumption plan. Portals 1 and 2 remain accessible and intact; main workings, crosscuts, stoped-out areas and partial historical infrastructure are in place; natural ventilation is unobstructed; no impediments to further evaluation were identified, though localized support rehabilitation is required.
1 hour ago
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
1 hour ago
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Read More
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
On September 3, Chengtun Mining announced that subsidiary Sichuan Shengfengyuan Mining will acquire a 65% stake in Tibet Haiteng Industrial from Liu Zongjun for RMB 709 million; the target will be consolidated upon closing. Tibet Haiteng holds exploration permits for the Baga-La (East) lead-zinc mine in Mozhugongka and Linzhou counties, Lhasa, Tibet, valid from July 28, 2026 to July 27, 2031, covering 42.0668 sq km. The target mine contains silver at large-deposit scale, lead and zinc at medium-deposit scale, with medium grades and favorable ore quality. The deal will increase the company's silver-lead-zinc resource base and optimize its mineral portfolio.
1 hour ago
Vizsla Copper to Acquire Alaska’s Delta Zinc-Lead-Copper VMS Project; Agnico to Take 19.99% Stake
4 hours ago
Vizsla Copper to Acquire Alaska’s Delta Zinc-Lead-Copper VMS Project; Agnico to Take 19.99% Stake
Read More
Vizsla Copper to Acquire Alaska’s Delta Zinc-Lead-Copper VMS Project; Agnico to Take 19.99% Stake
Vizsla Copper to Acquire Alaska’s Delta Zinc-Lead-Copper VMS Project; Agnico to Take 19.99% Stake
Vizsla Copper announced that it had agreed to acquire 100% of the Delta polymetallic VMS project and the Helm Bay gold project in Alaska from Agnico Eagle. The transaction is expected to close in the fourth quarter of 2026. Delta carries a historical resource estimate of 15.4 million tonnes grading 3.8% zinc, 1.7% lead, 0.6% copper, 62 g/t silver and 1.7 g/t gold; the estimate has not been verified as a current mineral resource. Vizsla will issue Agnico 22.52 million shares, representing approximately 19.99% of its issued shares at signing. Subject to disinterested shareholder approval, a further 2.90 million shares would lift Agnico’s ownership to about 22%. The consideration also includes 3.04 million two-year warrants exercisable at C$1.95 per share, plus 2% and 3% NSRs on Delta and Helm Bay, respectively. Agnico may invest up to C$5 million in Vizsla’s post-closing financing, provided the financing exceeds C$30 million.
4 hours ago