SMM 2017 Lead & Zinc Summit: How Will Zinc Industry Weather Central Government Checks?

Published: May 22, 2017 15:46
Zinc prices rocketed in 2016, but edged up on average so far this year.

SHANGHAI, May 22 (SMM) - Zinc prices rocketed in 2016, but edged up on average so far this year. Will supply tightness story continue to support zinc prices? How will the zinc industry react in the face of challenges such as tightening bank loans, cool down in the real estate market and strict environmental prospection?

SMM interviews some major industry insiders about these issues at the SMM 2017 Lead & Zinc Summit.

SMM 2017 Lead & Zinc Summit: Outlook of Zinc Downstream Industries

SMM: What do you think of the environmental protection and safety inspections in 2017? Will mines be affected this year or in the next few years?

One large mining company from Southwest China said local governments frequently execute checks, but they do not need to suspend production. The loss from environmental protection-driven suspension will be severe. Environmental protection will add to input of labor and capital.

SMM 2017 Lead & Zinc Summit: Will Zinc Concentrate Remain in Deficit in 2017?

Local governments and producers have the same goal. The former hopes producers will meet environmental protection requirements, and producers hope to maintain normal production. It is lose-lose situation if producers cease production, which will affect governments’ tax income and also bring losses for producers. Environmental protection may increase cost from such as water treatment. But effects on producers are limited since they have gotten ready for this issue.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
1 hour ago
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
Read More
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
On September 9, Salazar Resources updated progress on the Curipamba-El Domo polymetallic project in Ecuador, a JV with Silvercorp in which Salazar holds 25% (carried to production) and Silvercorp holds 75% as operator. The project has measured and indicated resources of 11.4 Mt grading 1.85% Cu, 2.11 g/t Au, 2.42% Zn and 0.22% Pb. Designed throughput is 666,000 t/year, with first production expected in July 2027 and an 11.5-year mine life.
1 hour ago
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
1 hour ago
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Read More
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
On September 9, Nicola Mining announced completion of an underground assessment of the Treasure Mountain silver-lead-zinc mine (~30 km NE of Hope, BC, Canada) by independent engineering firm McElhanney, advancing the 2027 resumption plan. Portals 1 and 2 remain accessible and intact; main workings, crosscuts, stoped-out areas and partial historical infrastructure are in place; natural ventilation is unobstructed; no impediments to further evaluation were identified, though localized support rehabilitation is required.
1 hour ago
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
1 hour ago
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Read More
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
On September 3, Chengtun Mining announced that subsidiary Sichuan Shengfengyuan Mining will acquire a 65% stake in Tibet Haiteng Industrial from Liu Zongjun for RMB 709 million; the target will be consolidated upon closing. Tibet Haiteng holds exploration permits for the Baga-La (East) lead-zinc mine in Mozhugongka and Linzhou counties, Lhasa, Tibet, valid from July 28, 2026 to July 27, 2031, covering 42.0668 sq km. The target mine contains silver at large-deposit scale, lead and zinc at medium-deposit scale, with medium grades and favorable ore quality. The deal will increase the company's silver-lead-zinc resource base and optimize its mineral portfolio.
1 hour ago