Home / Metal News / Tsingshan to Commence Full Operations at Phase 3 NPI Project in Indonesia

Tsingshan to Commence Full Operations at Phase 3 NPI Project in Indonesia

iconMar 23, 2017 11:37
Source:SMM
Tsingshan Group is expected to commence full operations soon at its Phase 3 NPI project in Indonesia, Shanghai Metals Market learns. 

SHANGHAI, Mar. 23 (SMM) – Tsingshan Group is expected to commence full operations soon at its Phase 3 NPI project in Indonesia, Shanghai Metals Market learns. 

China NPI Production to Hit by New Round of Environmental Protection Inspections, SMM Reports

The phase 3 project, with total capacity of 600,000 tonnes, is built into 2 stages. The first stage, with capacity of 300,000 tonnes, started trial run in December 2016, and the second stage, also having a capacity of 300,000 tonnes, is expected to come on stream soon. 

Tsingshan Group to Put Online Indonesian #300 Stainless Steel Project in Q3 2017

Tsingshan Group’s NPI projects in Indonesia have a total annual capacity of 1.50 million tonnes. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or limited. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
 

npi price
npi output
china npi output
Indonesia npi output

For queries, please contact Michael Jiang at michaeljiang@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news