Zinc is in a Record Deficit as Zinc Prices Near Record Highs

Published: Feb 20, 2017 17:31 (GMT+8)
Zinc hit a record shortage in 2016. According to the International Lead and Zinc Study Group, zinc registered a deficit of 286,000 metric tons last year. Global usage of refined zinc metal rose 3.6% w

by  on FEBRUARY 20, 2017

 

 

Source: MetalMiner IndX

Zinc hit a record shortage in 2016. According to the International Lead and Zinc Study Group, zinc registered a deficit of 286,000 metric tons last year. Global usage of refined zinc metal rose 3.6% while supply remained pretty much flat thanks to a number of mine shutdowns.

The tightening in zinc’s raw material segment accelerated last year thanks to the closure of big mines such as Century, Lisheen and Glencore‘s suspension of 500,000 mt of annual mine capacity. These closures have impacted the supply of mine concentrates drastically and, for the first time, we are seeing an impact in the refined metal market.

In February, Korea Zinc Co. announced it will reduce its refined zinc output by 7.7% (or 50,000 mt) this year. The company attributed its decision to tight supplies of mined concentrate and the accompanying reduction in treatment charges, which have plummeted to multiyear lows.

Prices at Multiyear Highs

 

Zinc is trading near multiyear highs. Source: MetalMiner analysis of Fastmarkets.com data.

As a result of this narrative of supply shortfall, zinc is trading at the highest levels in more than eight years. Bulls have been in such a powerful position that prices have barely retraced during this run.

Will China Cut Output This Year?

Outside of China, mine supply of zinc fell by 10% last year. However, production increased inside China. In 2017 investors will be closely monitoring China’s numbers. Although output rose, imports slumped by 38% last year. This, combined with falling treatment charges, suggests that a raw material shortfall is building in China as well. China must get serious about controlling industrial metals output to solve its pollution problems.

The conclusion: it’s only a matter of time before Chinese producers are forced to cut refined zinc output.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)