Main Sea Freight Index at Baltic Exchange Slightly Up to 894 Points

Published: Oct 19, 2016 10:05 (GMT+8)
The main sea freight index at Baltic Exchange for ships carrying dry bulk commodities slightly up on Monday.

UNITED KINGDOM October 18 2016 3:24 PM

LONDON (Scrap Register): The main sea freight index at Baltic Exchange for ships carrying dry bulk commodities slightly up on Monday, but the index has failed to climb back above the key 900 point level and bearish sentiment is prevailing for expectations of shipping demand this week.
The Baltic Dry Index, which provides an assessment of the price of moving the major raw materials – such as coal, iron ore and grain – by sea by taking in 23 shipping routes measured on a time charter basis, slightly up by 02 points to 894 points on Monday.
With this bearish sentiment comes the possibility that the BDI has already peaked for the year and now a few months of downside could follow. 
Typically, the BDI sees its seasonal peak in the October – December period, but the BDI saw a significant rally in September and has since pulled back. There was some optimism over an uptick in demand for shipping raw materials to China following the end of its week-long national day holiday, but that failed to materialize.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
3 hours ago
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
Read More
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
Kobrea Exploration Corp. announced the approval of a US$4 million 2026/27 exploration programme for the Western Malargüe Mining District in Mendoza Province, Argentina, fully funded by BHP. The programme includes diamond drilling at the El Destino copper-gold-molybdenum porphyry target, induced-polarisation surveys at El Destino and KBX-17, as well as geological mapping, geochemical sampling and hyperspectral work. The exploration alliance covers seven projects totaling approximately 733 square kilometres, where copper, gold and molybdenum geochemical anomalies have been identified. SMM analysis: approval of the new budget moves the BHP-Kobrea partnership from an alliance framework into an active drilling phase. However, the properties remain at an early exploration stage, with no molybden
3 hours ago
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
3 hours ago
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Read More
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Glencore plans to submit the environmental impact report for its El Pachón copper-molybdenum project in Argentina in Q1 2027 and aims to secure approval under the Incentive Regime for Large Investments, or RIGI, before July 2027. Glencore previously reported approximately 6 billion tonnes of mineral resources grading an average 0.43% copper, 2.2 g/t silver and 130 g/t molybdenum, equivalent to around 0.013% Mo. Based on the disclosed tonnage and average grade, the resource contains roughly 780,000 tonnes of in-situ molybdenum, although this does not represent reserves, recoverable metal or future production. During the 2025/26 exploration season, the project completed 53 drill holes totaling 21,246 metres and advanced preliminary road and bridge infrastructure.
3 hours ago
【Flash | Glencore Secures RIGI Approval for Argentina’s Agua Rica Copper-Gold-Silver-Molybdenum Project】
3 hours ago
【Flash | Glencore Secures RIGI Approval for Argentina’s Agua Rica Copper-Gold-Silver-Molybdenum Project】
Read More
【Flash | Glencore Secures RIGI Approval for Argentina’s Agua Rica Copper-Gold-Silver-Molybdenum Project】
【Flash | Glencore Secures RIGI Approval for Argentina’s Agua Rica Copper-Gold-Silver-Molybdenum Project】
Glencore announced that its Agua Rica project, known as MARA, has received approval under Argentina’s Incentive Regime for Large Investments, or RIGI. The large-scale copper-gold-silver-molybdenum deposit contains approximately 1.2 billion tonnes of measured and indicated mineral resources grading an average 0.03% molybdenum. Based on the disclosed tonnage and grade, the resource contains roughly 360,000 tonnes of in-situ molybdenum; however, this does not represent reserves, recoverable metal or future molybdenum production. Glencore also brought forward expected first production from the Alumbrera restart to H2 2027 from H1 2028. Alumbrera’s processing, logistics and workforce infrastructure is expected to support the future development of MARA. SMM analysis: RIGI approval improves the project’s fiscal and regulatory certainty, but no final investment decision, molybdenum recovery plan or molybdenum output guidance has been announced, leaving no direct near-term impact on molybdenum supply.
3 hours ago