Patache Port Belt Conveyor Terminal Damaged, Repairs Estimated at Two Months
게시됨: May 7, 2025 10:39
공유
공유
저장
According to SMM, the belt conveyor terminal at the Port of Patache was damaged during operations due to a collision with a vessel. Cargo loading operations at the port were halted two weeks ago, and repair work has already commenced. The estimated repair time is at least two months. Before the repairs are completed, Collahuasi copper concentrates that were previously transported through the Port of Patache will be transported by truck from the neighboring ports of Mejillones and Angamos, which has not significantly impacted the shipment of Collahuasi copper concentrates.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.