TBEA Invests in 1GW Photovoltaic, 2GW Wind Power, and Energy Storage Projects in Zhundong with Total Investments of Over 10 Billion Yuan

게시됨: Aug 30, 2024 13:51
TBEA announced on August 29 that the company invested in the construction of a 1GW photovoltaic and supporting energy storage project (hereinafter referred to as the "1GW Photovoltaic and Energy Storage Project in Zhundong") of the Zhundong Xinte Silicon-based Green and Low-carbon Silicon Industrial Park Demonstration Project, with its holding company Changji Shengyu New Energy Power Generation Co., Ltd. as the main body, and invested in the construction of a 2GW wind power and supporting energy storage project (hereinafter referred to as the "2GW Wind Power and Energy Storage Project in Zhundong") of the same project, with its holding company Changji Shengding New Energy Power Generation Co., Ltd. as the main body. The total investment in the 1GW Photovoltaic and Energy Storage Project in Zhundong is 3.495 billion yuan, while the total investment in the 2GW Wind Power and Energy Storage Project in Zhundong is 6.656 billion yuan.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
TBEA announced on August 29 that the company invested in the construct - Shanghai Metals Market (SMM)