Power Rationing May Strengthen in Guizhou and Guangxi, Over 4.4 Million Mt Annual Aluminium Production Capacity to Be Affected

게시됨: Sep 16, 2021 17:35 (GMT+8)
According to SMM survey, Guizhou Provincial Energy Bureau recently issued a notice on an orderly power utilisation plan in Guizhou Province in 2021, stating that the plan was formulated to actively respond to the power supply tension that may occur in local regions and ensure the safe and stable operation of the Guizhou power grid.

SHANGHAI, Sep 16 (SMM) – According to SMM survey, Guizhou Provincial Energy Bureau recently issued a notice on an orderly power utilisation plan in Guizhou Province in 2021, stating that the plan was formulated to actively respond to the power supply tension that may occur in local regions and ensure the safe and stable operation of the Guizhou power grid. The implementation includes three parts: prevention and pre-control, graded early warning, and graded response.

The plan involves 4 alumina plants in Guizhou Province (installed annual production capacity of 4.4 million mt, excluding Guizhou Qizheng) and all 5 aluminium plants (installed compliance annual production capacity of 1.34 million mt, current operating annual production capacity of 1.3 million mt).

The news of the tightening of power restrictions in Guangxi has once again been fermented. There was news that the power consumption of aluminium plants will be cut by 35% based on the monthly average consumption from January to July, and the power consumption of alumina plants will be cut by 70% on the same basis. SMM will continue to follow up the power rationing.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn