Jingtang Port to build an independent beneficiation plant with annual processing capacity of 9.6 million mt of iron ore

Telah Terbit: Nov 2, 2020 13:12
Recently, Tangshan Gangkunshi Industry and Trade Co. publicised an independent beneficiation plant project with an annual processing capacity of 9.6 million mt of iron ore. The project, which is located at Jingtang Port, will primarily process imported iron ore fines and sell to steel mills nearby ports in Tangshan.

SHANGHAI, Nov 2 (SMM) — Recently, Tangshan Gangkunshi Industry and Trade Co. publicised an independent beneficiation plant project with an annual processing capacity of 9.6 million mt of iron ore. The project, which is located at Jingtang Port, will primarily process imported iron ore fines and sell to steel mills nearby ports in Tangshan.

 

The first phase of the project will process 6 million mt of iron ore annually and will use Fe 55% iron ore as raw materials to produce Fe65% iron ore concentrates. The second phase will process 3.6 million mt of iron ore annually and purchase iron ore for blending.

 

According to the preliminary plan, the first and second phase will be put into operation in October 2021 and October 2022 respectively, with a total investment of 832.6 million yuan.

 

As Tangshan encourages steel mills to relocate, many steel mills have chosen to relocate to the vicinity of Jingtang Port and Caofeidian Port. Jingtang Port, in particular, will effectively reduce raw material and transportation costs of steel mill because of proximity to the port.

 

There will be a total of 10.8 million mt of capacity at new independent beneficiation plants at Jingtang Port, according to SMM statistics of independent beneficiation plant projects announced in the past two years. These beneficiation plants mainly process low-grade imported ore and provide steel mills with iron ore concentrates with higher grade and lower impurities. However, as the profit margin of independent beneficiation plants is directly affected by the price difference between high and low-grade ore, these projects have not started construction due to the current small price spread.

 

New independent beneficiation plant projects in Jingtang Port

 

Independent beneficiation plant projects

Region

 

Annual iron ore processing capacity (1 million mt)

Annual output of iron ore concentrates (1 million mt)

Year of publicisation

Tangshan Gangkunshi Industry and Trade Co., Ltd.

Tangshan, Hebei

9.60

8.00

2020

Tangshan Haigang Kaihexin Logistics Co., Ltd. (Phase I)

Tangshan, Hebei

0.80

0.67

2019

Tangshan Haigang Kaihexin Logistics Co., Ltd. (Phase II)

Tangshan, Hebei

2.80

2.33

2019

Hebei Lening Metallurgical Material Technology Co., Ltd.

 

/

6.00

2020

Tangshan Hongde Haisheng Mineral Products

 

2.00

1.80

2020

Tangshan Bingxu Industrial Co., Ltd.

 

2.40

2.00

2020

 

For more information please refer to our latest editon of China Iron Ore Weekly Monitor.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
3 Sep 2026 19:00
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
Baca Selengkapnya
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
[SMM Kilat Logam Mulia] Yen Jepang melonjak tajam selama perdagangan Rabu, dengan USD/JPY turun di bawah 159 dan ditutup melemah 0,92% di 158,69, memicu spekulasi intervensi mata uang Jepang. Indeks dolar juga turun tajam, dengan lingkungan dolar yang lebih lemah memberikan dukungan bagi logam mulia.
3 Sep 2026 19:00
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
26 Aug 2026 17:02
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
Baca Selengkapnya
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
[Dinamika Perusahaan Baterai Timbal-Asam] Baru-baru ini, Biro Ekologi dan Lingkungan Kota Wuhu menerbitkan opini persetujuan, dan analisis dampak lingkungan untuk proyek perakitan baterai timbal-karbon dengan kapasitas produksi tahunan 500.000 kVAh dari Anhui Motu Technology Group Co., Ltd. secara resmi disetujui. Perusahaan akan menerapkan berbagai langkah perlindungan lingkungan sesuai dengan persyaratan persetujuan analisis dampak lingkungan, melanjutkan pekerjaan pendahuluan selanjutnya, dan memulai konstruksi proyek setelah semua kondisi siap.
26 Aug 2026 17:02
PBOC Umumkan Operasi Reverse Repo Overnight dan MLF, Dongkrak Valuasi Logam Mulia
25 Aug 2026 11:32
PBOC Umumkan Operasi Reverse Repo Overnight dan MLF, Dongkrak Valuasi Logam Mulia
Baca Selengkapnya
PBOC Umumkan Operasi Reverse Repo Overnight dan MLF, Dongkrak Valuasi Logam Mulia
PBOC Umumkan Operasi Reverse Repo Overnight dan MLF, Dongkrak Valuasi Logam Mulia
[SMM Logam Mulia Ekspres] Bank Sentral China (PBoC) mengumumkan akan melakukan operasi reverse repo semalam mulai 27 Agustus hingga 1 September, dengan volume harian tidak melebihi 600 miliar yuan, dan akan melakukan operasi MLF satu tahun sebesar 500 miliar yuan pada 25 Agustus. Lingkungan likuiditas yang longgar mendukung valuasi logam mulia.
25 Aug 2026 11:32
Jingtang Port to build an independent beneficiation plant with annual processing capacity of 9.6 million mt of iron ore - Shanghai Metals Market (SMM)