No sale agreement has been reached. Vale New Caledonia Nickel and Cobalt Plant may be closed.

Telah Terbit: Sep 09, 2020 16:24 (GMT+8)

SMM9 March 9: it is reported that due to the inability to reach an agreement with NCZ (New Century Resources Limited) on the sale of New Caledonia Nickel assets VNC (Noveelle Caledonie SAS), Vale said that it will take the necessary measures to overhaul VNC to deal with potential shutdown risks, and Vale is still looking for a solution.

VNC owns the Goro nickel / cobalt mine, where production began in 2011 and its processing plant has a designed production capacity of up to 57000 tons per year, while the refinery is designed to produce 80% of nickel oxide and 20% mixed hydroxide, and cobalt is also produced in the form of cobalt carbonate.

The VNC mine produced 23400 tons of nickel in 2019, down from 32500 tons in 2018.

Vale, the world's largest nickel producer, with operations in Brazil, Canada and Indonesia, as well as New Caledonia in the south-west Pacific, produced 208000 tons of finished nickel in 2019.

"Click to understand and sign up: 2020 China Automotive New Materials Application Summit Forum

Scan the QR code above to view the business cards of the participating companies and sign up online

Scan the code and apply to join the SMM Automotive Industry Exchange Group.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
2 jam yang lalu
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
Baca Selengkapnya
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
Pabrik NPI RKEF IMIP mulai memangkas beban operasi sebesar 30–40% akibat kekurangan air. Pemangkasan berkepanjangan dapat mengurangi produksi NPI kumulatif lebih dari 100 ribu ton, setara dengan lebih dari 11 ribu ton nikel pada kadar 11%. Sementara itu, permintaan yang lemah diperkirakan menurunkan produksi baja tahan karat seri 300 China pada Oktober lebih dari 100 ribu ton. Persediaan NPI yang tinggi dapat meredam dampak awal, dengan dukungan harga bergantung pada durasi gangguan dan pembelian hilir.
2 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (23 Sep)
3 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 23 Sep 2026.
3 jam yang lalu
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
4 jam yang lalu
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
Baca Selengkapnya
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
Pasar bijih nikel Indonesia tetap stabil pada 23 September, dengan penilaian SMM untuk bijih nikel Indonesia yang dikirim ke pelabuhan tujuan tidak berubah di semua kadar utama: Ni 1,2%: $26,5/wmt, tidak berubah. Ni 1,3%: $28,5/wmt, tidak berubah. Ni 1,4%: $51,8/wmt, tidak berubah. Ni 1,5%: $58,5/wmt, tidak berubah. Ni 1,6%: $63,4/wmt, tidak berubah. Di pasar, persetujuan RKAB tambahan 2026 secara bertahap memasuki pasar, membantu meredakan kekurangan bijih nikel sebelumnya. Namun, total kuota tambahan belum diumumkan secara resmi, dan laju pelaksanaan kuota tetap menjadi faktor kunci untuk pasokan bijih dan produksi smelter selanjutnya. Sementara itu, kekeringan akibat El Niño muncul sebagai kekhawatiran baru di sisi pasokan. IMIP mengonfirmasi bahwa kekurangan air telah memaksa beberapa smelter mengurangi produksi NPI, meskipun operasi belum dihentikan.
4 jam yang lalu