Iron ore shipments from Australia recovered on improved weather

Published: Feb 25, 2020 13:25
SMM estimates that there were 71 vessels carrying 11.42 million mt of iron ore arrived at major Chinese ports during February 16-22, up 1.01 million mt from the week ended February 15.

SHANGHAI, Feb 25 (SMM) – SMM estimates that there were 71 vessels carrying 11.42 million mt of iron ore arrived at major Chinese ports during February 16-22, up 1.01 million mt from the week ended February 15


During the same period, iron ore deliveries leaving Australian ports increased 4.28 million mt on the week to 14.45 million mt, as the impact of tropical cyclones eased. 


Shipments that departed Brazilian ports were also estimated to rise 480,000 mt on the week, to 4.61 million mt. This was 1.78 million mt lower from the same period last year. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
8 hours ago
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Read More
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
[SMM Lead Market News] It was learned that since April, affected by environmental protection rectification and extended shipping cycles, lead smelters in Southeast Asia have experienced production cuts and shutdowns. Lead ingot supply has gradually tightened, spot premiums have risen, and high-grade lead ingots have even become difficult to source. Currently, the SMM Malaysia lead ingot 99.99-99.995% CIF premium was quoted at $150-170/mt, with a few suppliers once again making exploratory offers at a premium of $200/mt, though no transactions have been concluded at this price.
8 hours ago
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
May 9, 2026 20:23
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Read More
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
[Waste Lead-Acid Battery Market Dynamics] It was reported that one waste lead-acid battery collection and storage entity has been established in Zhangye City, Gansu Province, namely Zhangye Mingcheng Waste Battery Recycling Co., Ltd., which has obtained the Hazardous Waste Operating License issued by the Department of Ecology and Environment of Gansu Province. The approved operating method and category is the collection (HW31, 900-52) of waste lead-acid batteries, with an operating capacity of 2,000 mt/year. A total of 4 waste lead-acid battery collection sites have been set up across the city.
May 9, 2026 20:23
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50