Philippine likely to halt mining in its top export area for high-grade nickel ore

Telah Terbit: Aug 20, 2019 14:28 (GMT+8)
Dwindling resources will make it harder to explore new mines

SHANGHAI, Aug 20 (SMM) – The Philippine may soon suspend mining activities in its southernmost province of Tawi-Tawi, the country’s biggest exporter of high-grade nickel ore to China, due to resource depletion and degradation, according to a preliminary decision by the Philippine Minister of Resources.

SMM learned that three key mines, ANC, PAX and SR Languyan, are in Tawi–Tawi. ANC has suspended shipments on resource exhaustion. While PAX and SR Languyan maintained normal shipments so far, SR Languyan, the largest high-grade nickel ore supplier in the Philippines, planned to stop mining in October as its ore deposits are also nearly depleted.

SMM expects closure of miners in Tawi-Tawi in October though a final decree has not been confirmed. Dwindling resources will make it harder to explore new nickel mines. 

Suspension of local mining will likely reduce an annual supply of 79,000 mt metal content of nickel ore, which accounted for 3.5% of the global supply, SMM estimated. 

SMM data showed that a total of some 150 vessels carrying 8.25 million wmt of nickel ore departed the Tawi-Tawi area in 2018, accounting for 21% of the total shipments from the Philippine. 

Worries about tightened shipments of nickel ore from the Philippines is expected to extend increases in nickel ore prices this week.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
15 jam yang lalu
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
Baca Selengkapnya
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
[SMM Analysis] Pemangkasan NPI terkait air IMIP di tengah lemahnya permintaan baja nirkarat
Pabrik NPI RKEF IMIP mulai memangkas beban operasi sebesar 30–40% akibat kekurangan air. Pemangkasan berkepanjangan dapat mengurangi produksi NPI kumulatif lebih dari 100 ribu ton, setara dengan lebih dari 11 ribu ton nikel pada kadar 11%. Sementara itu, permintaan yang lemah diperkirakan menurunkan produksi baja tahan karat seri 300 China pada Oktober lebih dari 100 ribu ton. Persediaan NPI yang tinggi dapat meredam dampak awal, dengan dukungan harga bergantung pada durasi gangguan dan pembelian hilir.
15 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (23 Sep)
16 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Data: Pergerakan pasar SHFE, DCE (23 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 23 Sep 2026.
16 jam yang lalu
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
16 jam yang lalu
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
Baca Selengkapnya
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
【SMM Kilas Nikel】Pembaruan Pasar Nikel Indonesia — 23 September 2026
Pasar bijih nikel Indonesia tetap stabil pada 23 September, dengan penilaian SMM untuk bijih nikel Indonesia yang dikirim ke pelabuhan tujuan tidak berubah di semua kadar utama: Ni 1,2%: $26,5/wmt, tidak berubah. Ni 1,3%: $28,5/wmt, tidak berubah. Ni 1,4%: $51,8/wmt, tidak berubah. Ni 1,5%: $58,5/wmt, tidak berubah. Ni 1,6%: $63,4/wmt, tidak berubah. Di pasar, persetujuan RKAB tambahan 2026 secara bertahap memasuki pasar, membantu meredakan kekurangan bijih nikel sebelumnya. Namun, total kuota tambahan belum diumumkan secara resmi, dan laju pelaksanaan kuota tetap menjadi faktor kunci untuk pasokan bijih dan produksi smelter selanjutnya. Sementara itu, kekeringan akibat El Niño muncul sebagai kekhawatiran baru di sisi pasokan. IMIP mengonfirmasi bahwa kekurangan air telah memaksa beberapa smelter mengurangi produksi NPI, meskipun operasi belum dihentikan.
16 jam yang lalu