Power supply curbs in Guangdong’s Yangjiang to impact local NPI, stainless steel production

Telah Terbit: Jun 21, 2019 09:54 (GMT+8)
This is estimated to lower NPI output from Yangjiang in Jun by 500 mt in Ni content

SHANGHAI, Jun 21 (SMM) – Power supply to producers of nickel pig iron and stainless steel in Yangjiang of Guangdong province will be limited for 15-20 days, starting from Thursday June 20, due to a power line reconstruction, SMM learned.

A local NPI plant told SMM that this is expected to impact production by about 10%.

This is estimated to lower NPI output from Yangjiang in June by 500 mt in Ni content, as output in May came in at 5,000 mt in Ni content, which accounted for 1% of the nationwide total.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn