Central SOEs Beat Steel and Coal Capacity Cut Goals

Telah Terbit: Sep 28, 2017 16:45 (GMT+8)
Central state-owned enterprises (SOEs) have cut more steel and coal capacity than the central government has ordered last year and in January-August this year.

SHANGHAI, Sept. 28 (SMM) – Central state-owned enterprises (SOEs) have cut more steel and coal capacity than the central government has ordered last year and in January-August this year.

In 2016, steel and coal capacity cut by central SOEs took up 80% and 73%, respectively, of total cuts nationwide. 

In January-August 2017, central SOEs slashed another 16.14 million tonnes of steel capacity and 55.10 million tonnes of coal capacity. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Heyuan Menerbitkan Regulasi Ketat dan Denda untuk Pengelolaan Aki Bekas Tanpa Izin
28 Sep 2026 17:34 (GMT+8)
Heyuan Menerbitkan Regulasi Ketat dan Denda untuk Pengelolaan Aki Bekas Tanpa Izin
Baca Selengkapnya
Heyuan Menerbitkan Regulasi Ketat dan Denda untuk Pengelolaan Aki Bekas Tanpa Izin
Heyuan Menerbitkan Regulasi Ketat dan Denda untuk Pengelolaan Aki Bekas Tanpa Izin
[Pembaruan Pasar Aki Bekas] Baru-baru ini, Biro Ekologi dan Lingkungan Kota Heyuan mengeluarkan "Pemberitahuan tentang Pengaturan Pengelolaan Aki Bekas." Menurut Kitab Undang-Undang Lingkungan Ekologis Republik Rakyat Tiongkok, perusahaan dan lembaga publik yang melakukan pengumpulan dan penyimpanan limbah tanpa izin dapat didenda 200.000-1 juta yuan; yang melakukan operasi pemanfaatan dan pembuangan tanpa izin dapat didenda 1-5 juta yuan dan diperintahkan untuk menghentikan operasi atau ditutup, dengan penanggung jawab didenda 100.000-1 juta yuan; jika perbuatan tersebut merupakan tindak pidana, pertanggungjawaban pidana akan dituntut sesuai dengan hukum.
28 Sep 2026 17:34 (GMT+8)
"Guangzhou Perketat Pengelolaan Baterai Asam Timbal Bekas Sepeda Listrik, Perjelas Aturan Limbah B3"
28 Sep 2026 17:33 (GMT+8)
"Guangzhou Perketat Pengelolaan Baterai Asam Timbal Bekas Sepeda Listrik, Perjelas Aturan Limbah B3"
Baca Selengkapnya
"Guangzhou Perketat Pengelolaan Baterai Asam Timbal Bekas Sepeda Listrik, Perjelas Aturan Limbah B3"
"Guangzhou Perketat Pengelolaan Baterai Asam Timbal Bekas Sepeda Listrik, Perjelas Aturan Limbah B3"
[Dinamika Pasar Aki Bekas Sepeda Motor Listrik] Baru-baru ini, Biro Ekologi dan Lingkungan Kota Guangzhou mengeluarkan pemberitahuan tentang poin-poin penting pengelolaan lingkungan aki bekas sepeda motor listrik di Guangzhou. Dokumen tersebut menegaskan bahwa aki bekas merupakan limbah berbahaya (HW31, 900-52), dan aki bekas yang dihasilkan dari daur ulang toko, tukar tambah, dan perbaikan harus diserahkan kepada unit yang memiliki izin. Unit yang memegang izin pengumpulan limbah berbahaya (termasuk 900-52) dibebaskan dari manifes transfer elektronik selama proses pengumpulan dalam program percontohan pengumpulan terpusat.
28 Sep 2026 17:33 (GMT+8)
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
26 Sep 2026 01:38 (GMT+8)
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Baca Selengkapnya
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Menteri Energi dan Pertambangan Peru Guillermo Shinno mengatakan negaranya berharap dapat menambah sekitar 1 juta ton produksi tembaga tahunan dalam lima hingga enam tahun ke depan melalui proyek-proyek pertambangan baru. Produsen tembaga terbesar ketiga di dunia itu memperkirakan produksi 2026 sebesar 2,5 hingga 2,7 juta ton, hampir tidak berubah dari 2023 karena menurunnya kadar bijih dan konflik sosial yang berulang membebani pasokan. Pemerintah yang baru terpilih berupaya membalikkan stagnasi itu dengan memangkas birokrasi; dalam dua bulan sejak menjabat, perusahaan-perusahaan pertambangan telah meningkatkan keterlibatan dengan kementerian tersebut. Shinno mengatakan para pejabat telah mengidentifikasi 27 izin yang dapat dihapus dari sekitar 100 persyaratan sektor pertambangan, tanpa menurunkan standar lingkungan
26 Sep 2026 01:38 (GMT+8)