Jiangxi Copper Releases Copper Products Output in 1H 2017, with Copper Cathode up 7.47 Per cent YoY

Telah Terbit: Aug 30, 2017 11:01
Jiangxi Copper released its output data of copper products during the first half of the year, with details in table below.

SHANGHAI, Aug. 30 (SMM) – Jiangxi Copper released its output data of copper products during the first half of the year, with details in table below.

Jiangxi Copper Posts 75 Per cent Rise in Net Profit in 1H 2017

Product

Output

YoY Change

Copper cathode

644,900 tonnes

up 7.47%

Copper concentrate

104,700 tonnes (Cu content)

down slightly from 105,900 tonnes (Cu content)

Copper rod

462,200 tonnes

up 18.21%

Other copper semis

74,500 tonnes

up 13.05%

 

The company set a 2017 production target for copper concentrate at 208,900 tonnes (Cu content) in the whole year of 2017, down slightly from 209,900 tonnes (Cu content) in 2016.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or limited. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
India dan Rusia Menjajaki Kemitraan Pertambangan dan Mineral Kritis yang Diperluas
6 jam yang lalu
India dan Rusia Menjajaki Kemitraan Pertambangan dan Mineral Kritis yang Diperluas
Baca Selengkapnya
India dan Rusia Menjajaki Kemitraan Pertambangan dan Mineral Kritis yang Diperluas
India dan Rusia Menjajaki Kemitraan Pertambangan dan Mineral Kritis yang Diperluas
New Delhi dan Moskow berupaya memperluas kerja sama dari eksplorasi mineral hingga material canggih.
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (09 Sep)
9 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (09 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (09 Sep)
Data: Pergerakan pasar SHFE, DCE (09 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 09 Sep 2026.
9 jam yang lalu
Cobre Amankan Pasokan Bijih Pihak Ketiga untuk Menambah 300 ton/bulan Katoda Tembaga di Sierra Atacama
9 jam yang lalu
Cobre Amankan Pasokan Bijih Pihak Ketiga untuk Menambah 300 ton/bulan Katoda Tembaga di Sierra Atacama
Baca Selengkapnya
Cobre Amankan Pasokan Bijih Pihak Ketiga untuk Menambah 300 ton/bulan Katoda Tembaga di Sierra Atacama
Cobre Amankan Pasokan Bijih Pihak Ketiga untuk Menambah 300 ton/bulan Katoda Tembaga di Sierra Atacama
Cobre Limited mengumumkan pada 9 September bahwa operasi Sierra Atacama di Chile telah menandatangani perjanjian pembelian bijih dengan dua penambang tembaga oksida pihak ketiga di wilayah Antofagasta, dengan pengiriman diperkirakan meningkat mulai kuartal IV 2026. Perjanjian tersebut diperkirakan memasok sekitar 50.000–75.000 ton bijih oksida per bulan dengan kadar tembaga total 1,0–1,5%, menambah sekitar 300 ton per bulan produksi katoda tembaga. Produksi tambahan tersebut akan diproses melalui pabrik SX-EW Sierra Atacama yang sudah ada, yang memiliki kapasitas katoda tembaga terpasang sekitar 20.000 ton per tahun dan saat ini beroperasi di bawah kapasitas terpasang. Karena bijih yang dibeli tidak mengharuskan Cobre menanggung biaya penambangan dan pengembangan sendiri, perusahaan menyatakan biaya tambahan terutama terdiri dari harga pembelian bijih dan biaya pemrosesan variabel, termasuk asam, listrik, dan reagen. Throughput yang lebih tinggi juga diharapkan dapat menyebarkan biaya tetap pabrik ke basis produksi yang lebih besar. Sekitar 300 ton per bulan katoda tambahan akan menjadi tambahan di luar target produksi Cobre yang telah diumumkan sebelumnya, yang tetap tidak berubah. Perusahaan terus menstabilkan produksi bawah tanah sambil mempersiapkan transisi menuju operasi tambang terbuka yang lebih besar mulai 2027. Cobre menyatakan negosiasi dengan pemasok bijih regional tambahan juga sedang berlangsung, yang berpotensi memberikan pasokan lebih lanjut bagi fasilitas SX-EW yang belum dimanfaatkan sepenuhnya. Perjanjian tersebut merupakan peningkatan pasokan katoda tembaga dalam jangka pendek dari Sierra Atacama tanpa memerlukan pengembangan penambangan tambahan atau kapasitas pemrosesan baru. Pada tingkat awal yang diperkirakan, pasokan pihak ketiga dapat menyumbang sekitar 3.600 ton katoda tambahan secara tahunan. Lebih penting lagi, hal ini seharusnya meningkatkan utilisasi pabrik SX-EW yang ada menjelang transisi Cobre yang direncanakan menuju produksi tambang terbuka yang diperluas pada 2027. Perjanjian pasokan bijih lebih lanjut akan memberikan potensi kenaikan tambahan pada utilisasi pabrik dan produksi katoda.
9 jam yang lalu
Jiangxi Copper Releases Copper Products Output in 1H 2017, with Copper Cathode up 7.47 Per cent YoY - Shanghai Metals Market (SMM)