On November 28th, the first "PV storage charging and inspection" integrated demonstration station in Luoyang City, Henan Province, jointly built by Henan Julei Environmental Technology Co., Ltd., a wholly-owned subsidiary of Luoyang Municipal Construction Group Co., Ltd., and Telaide Electric, officially started operation.
It is reported that the charging station includes 2 600kW liquid-cooled super charging terminals, 52 split DC fast chargers and 14 AC slow chargers, which can simultaneously provide charging services for 68 new energy vehicles. The charging station covers an area of 1800m² with photovoltaic rain sheds, generating an annual electricity of 370,000 kWh. Together with the energy storage system of the charging station, it can maximize the assimilation of new energy electricity, effectively balance the power supply side and load side, and alleviate the pressure on the power grid.
In addition, the charging station has dedicated charging spaces for cement tank trucks, dumper trucks, other engineering vehicles, as well as large special vehicles for logistics, environmental sanitation, and public transportation, meeting the charging needs of different vehicles.
![Les prix du magnésium augmentent pour la troisième séance consécutive ! Le côté coûts reste « brûlant » tandis que la demande peine à prendre le relais [Commentaire SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


