Shandong Gold: the planned output of mineral gold in 2021 is about 24.5 tons.

Publié: Oct 8, 2021 18:50
[Shandong Gold: the planned output of mineral gold in 2021 is about 24.5 tons] Shandong Gold Mining Co., Ltd. At the 14th meeting of the sixth session of the board of directors, the motion on the company's 2021 production plan was considered and adopted by division.

Shandong Gold issued a notice saying that due to the impact of two safety accidents at Qixia Mangshan Gold Mine in Qixia City and Caojiawa Gold Mine in Zhaoyuan, Shandong (two local enterprises, none of which are owned by Shandong Gold), mines in Shandong Province, which belongs to the company, have carried out safety inspections since February 2021 in accordance with the requirements of local authorities. According to the progress of the resumption of mining in the province so far, Shandong Gold has decided on the production plan for 2021: the output of mineral gold is about 24.5 tons. (the plan is based on the company's current production situation, and the board of directors is likely to adjust accordingly according to the progress in the fourth quarter of 2021.)

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Shandong Gold: the planned output of mineral gold in 2021 is about 24.5 tons. - Shanghai Metals Market (SMM)