[95MW/380MWh! Guohua Investment's 2024 Fourth Batch of Energy Storage System Centralised Procurement]
SMM has learned that on December 23, Guohua Investment, a subsidiary of China Energy Group, announced the tender for the 2024 fourth batch of energy storage system equipment centralised procurement. The procurement scope includes but is not limited to 95MW/380MWh electrochemical energy storage system equipment, comprising energy storage battery systems, Power Conversion System (PCS), and EMS energy management systems, to be applied in the Shandong Development Investment Jingtai East 190MW/760MWh energy storage station project located in Baiyin City, Gansu Province. The tender requires bidders to be manufacturers of energy storage battery cells, or manufacturers of Power Conversion Systems (PCS), or manufacturers of energy storage Battery Management Systems (BMS).
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


