Fitch: Copper Output at Mines to Increase 7.8% This Year

Publicado: Oct 26, 2021 16:24 (GMT+8)
According to MiningWeekly, Fitch Solutions predicts that the copper output at global mines will increase 7.8% this year compared to last year due to the commissioning of multiple new projects and the low base in 2020 driven by the Covid-19 pandemic.

SHANGHAI, Oct 26 (SMM) – According to MiningWeekly, Fitch Solutions predicts that the copper output at global mines will increase 7.8% this year compared to last year due to the commissioning of multiple new projects and the low base in 2020 driven by the Covid-19 pandemic.

The research company said that the forecast for 2021 is mainly based on the expansion project of BHP’s Spence copper mine which commenced production in December 2020.

It is estimated that from 2021 to 2030, the annual copper output of global mines will increase from 20.2 million mt to 29.4 million mt, with an average annual growth rate of 3.8%.

Fitch predicts that from 2021 to 2030, the average annual growth rate of copper production at China's mines will drop to 1.3%, compared with 6.6% in the previous 10 years. Declining copper mine grades and delayed production expansion are the main reasons for the slowdown in production growth. However, due to the commissioning of new projects, China's domestic production will continue to grow.

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
Vedanta planea una expansión de cobre por 2.300 millones de dólares y la reapertura de la fundición de Tuticorin
hace 1 hora
Vedanta planea una expansión de cobre por 2.300 millones de dólares y la reapertura de la fundición de Tuticorin
Leer más
Vedanta planea una expansión de cobre por 2.300 millones de dólares y la reapertura de la fundición de Tuticorin
Vedanta planea una expansión de cobre por 2.300 millones de dólares y la reapertura de la fundición de Tuticorin
Vedanta Copper aspira a una producción de 1 millón de toneladas anuales de cobre en India y Arabia Saudí para finales de la década, con la propuesta de reanudar la fundición de Tuticorin como eje central de sus planes de expansión nacional.
hace 1 hora
【Flash | Informe técnico de Adanac describe suministro primario de molibdeno de larga vida】
hace 3 horas
【Flash | Informe técnico de Adanac describe suministro primario de molibdeno de larga vida】
Leer más
【Flash | Informe técnico de Adanac describe suministro primario de molibdeno de larga vida】
【Flash | Informe técnico de Adanac describe suministro primario de molibdeno de larga vida】
EraNova Metals presentó un informe técnico PEA conforme a la norma NI 43-101 para su proyecto de molibdeno Adanac, de su entera propiedad, en Canadá. El informe confirma los resultados del 6 de agosto sin diferencias significativas. La operación propuesta de 30.000 toneladas diarias tiene una vida útil de 24 años y prevé una producción media anual de molibdeno de 11,4 millones de libras (unas 5.171 toneladas), con 270,1 millones de libras (unas 122.515 toneladas) de molibdeno pagadero a lo largo de la vida de la mina. El capital inicial se estima en 953,3 millones de dólares canadienses. EraNova planea iniciar un estudio de viabilidad y avanzar en la evaluación ambiental y los permisos. La PEA sigue siendo preliminar, sin decisión final de inversión ni calendario de producción.
hace 3 horas
【Flash | El trabajo de campo en Malmbjerg impulsa la ingeniería detallada y las adquisiciones】
hace 4 horas
【Flash | El trabajo de campo en Malmbjerg impulsa la ingeniería detallada y las adquisiciones】
Leer más
【Flash | El trabajo de campo en Malmbjerg impulsa la ingeniería detallada y las adquisiciones】
【Flash | El trabajo de campo en Malmbjerg impulsa la ingeniería detallada y las adquisiciones】
Greenland Resources completó su programa de campo de verano ampliado en el proyecto de molibdeno Malmbjerg. Los trabajos abarcaron estudios de infraestructura, investigaciones del glaciar, optimización del RopeCon e inspecciones geotécnicas. El equipo también recolectó 8 toneladas de testigos de perforación y 14 toneladas de agua salina y dulce para pruebas piloto metalúrgicas con apoyo gubernamental. Los resultados respaldarán la ingeniería de detalle, la adquisición de equipos clave y los contratos de construcción. Sobre una base del 100 %, el estudio de factibilidad contempla una producción promedio de 32,8 millones de libras (unas 14.878 toneladas) de molibdeno contenido anual durante los primeros diez años. Esta sigue siendo la capacidad planificada; no se anunció ninguna decisión final de inversión ni de construcción.
hace 4 horas
Fitch: Copper Output at Mines to Increase 7.8% This Year - Shanghai Metals Market (SMM)