[PV: Philippines to Launch GEA-7 Solar Auction with Mandatory Storage for Ground-Mounted Projects]
The Department of Energy of Philippines has confirmed that the seventh Green Energy Auction (GEA-7) will launch in 2026, with the terms of reference expected in Q2. The auction will cover rooftop, ground-mounted, and floating solar, with floating solar including unsubscribed capacity from GEA-4. The program will allocate capacity nationwide but significantly increase allocations in Mindanao, potentially around five times larger than previous rounds to stimulate regional investment. Ground-mounted solar projects must include battery energy storage systems to enhance grid stability. Rooftop and ground-mounted projects are targeted to begin operations in 2027, while floating solar projects are expected between 2027 and 2029.